The City is seeking the services of a qualified water utility contractor on an “as-needed” basis to perform installation and repair of water and sewer utility infrastructure, including pipes, manholes, valves, fire hydrants and all other appurtenances. Contractor must be able to respond within 48 hours under non-emergency scenarios and immediately in an emergency. Contractor must provide equipment and manpower sufficient to perform work. City will normally provide materials for necessary work.
Any equipment charges shall be for actual time used on the job (no idle time charges will be billed or accepted).
Type of work: On-call water and sewer utility installation and repair services
Engineer's estimate: $200,000
Bid opening: November 12, 2026 at 2:00 PM (Chicago) — 202 E. Pilar Street, Room 239, Nacogdoches, TX 75961
Questions asked: 3
Bid documents (download requires a free CivCast account):
The contractor must provide equipment and manpower sufficient to perform on-call water and sewer utility installation and repair services. The City will normally provide materials for necessary work. The contractor must be able to respond within 48 hours under non-emergency scenarios and immediately in an emergency. Equipment charges shall be for actual time used on the job with no idle time charges billed or accepted.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ae213800c60e705df3355d4), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.