PRELIMINARY SITE DEVELOPMENT BID PACKAGE – LONG LANE
Tekton Construction and Development Partners is requesting preliminary/budgetary pricing for the proposed Long Lane subdivision/site development project in Fort Bend County, Texas.
Project Information:
Preliminary Scope for Pricing:
Important: This is a preliminary site layout only. Final civil construction plans and specifications have not been provided. Pricing may be revised when final grading, drainage, paving, utility, and construction details are issued.
Type of work: Preliminary Site Development, Roadway, Earthwork & Detention Improvements
Bid opening: November 6, 2026 at 6:00 PM (Chicago) — Please submit preliminary/budgetary pricing with a clear scope breakdown, unit pricing where applicable, assumptions, exclusions, lead times, estimated construction duration, and proposal validity.
Questions asked: 2
This request is for preliminary/budgetary pricing only. The current plan shows the proposed overall subdivision layout, roadway, lots, sidewalks, and detention area. Detailed civil construction information has not yet been issued. Do not assume underground utilities, storm sewer quantities, pavement thicknesses, soil stabilization requirements, or other construction details that are not specifically shown on the provided plan. Clearly list all assumptions and exclusions in your proposal.
Bidders shall review the attached preliminary Long Lane Site Plan prior to submitting pricing. The current drawings are provided for preliminary/budgetary estimating purposes only. Contractors shall verify quantities from the plans and clearly identify all assumptions and exclusions. Final pricing shall be subject to revision upon issuance of complete civil construction drawings, grading/drainage plans, pavement details, utility plans, specifications, and geotechnical information.
Bid documents (download requires a free CivCast account):
The preliminary scope for pricing includes site clearing and preparation as required, preliminary earthwork and grading, proposed internal roadway construction, roadway subgrade/base preparation, curbs associated with the proposed roadway, sidewalks where shown, cul-de-sac/turnaround construction, proposed detention pond excavation and grading, and site restoration associated with the above work.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>We are currently acting as the GC and collecting subcontractor pricing for this project. At this time, we do not have an estimated project cost range available. Please provide your best preliminary/budgetary pricing based on the plans and scope provided.</p><p></p><p>Thank you </p><p>venkat</p>""6cb9206a-0222-4959-92a3-b6649606ca52""2026-10-22T21:50:49.705Z"false"<p>Hi Alan</p><p></p><p>The bid deadline has been extended to <strong>November 6, 2026, at 6:00 PM Central Time</strong>. Please submit pricing in your company’s proposal format, including a scope breakdown, inclusions, exclusions, and assumptions. Preliminary or budgetary pricing is acceptable.</p><p>Thank you</p><p>Venkat</p>""74fe91ad-7011-470a-9890-a8838143e59a""2026-10-29T17:21:30.212Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ad84a61e1467364a8ecb5c0), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.