New treatment train: anoxic basin, aeration basin, secondary clarifier, sludge holding basin, chlorine contact basin, and tertiary disc cloth filter
Associated blower, electrical, instrumentation, and controls improvements
Irrigation pond expansion and upgrades, including geomembrane liner and gravel underdrain system
Decorative masonry wall and columns, plus landscape and irrigation improvements
Lift station pump installation
Type of work: Water Reclamation Facility Expansion, Irrigation Pond Improvements, and Misc. Landscaping and Irrigation Improvements
Engineer's estimate: 8,000,000
Pre-bid meeting: October 27, 2026 at 2:00 PM (Chicago) — George Butler Associates, Inc. 9601 Amberglen Blvd, Suite 109, Austin, TX 78729 — Attendance is mandatory. Bids will not be opened unless the bidder or its representative attended.
Bid opening: December 1, 2026 at 2:00 PM (Chicago) — George Butler Associates, Inc. 9601 Amberglen Blvd, Suite 109, Austin, TX 78729 — Sealed paper bids delivered to George Butler Associates, Inc. A bid bond or certified/cashier's check of at least 2% of the total bid amount is required.
Questions due: November 3, 2026 at 2:00 PM (Chicago)
Questions asked: 14
Bid documents (download requires a free CivCast account):
Construct a new treatment train with anoxic basin, aeration basin, secondary clarifier, sludge holding basin, chlorine contact basin and tertiary disc cloth filter, with associated blower, electrical, instrumentation and controls improvements, expand and upgrade the irrigation pond including geomembrane liner and gravel underdrain system, build decorative masonry wall and columns with landscape and irrigation improvements, and install lift station pumps.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The City of Leander requires that all integration work to the City’s SCADA system be performed by CPUSA, the City’s SCADA integrator. No other integrators will be accepted for this scope. Bidders should coordinate directly with CPUSA for pricing of Bid Item 49.</p>""29749c40-cc13-436d-b12a-54d773684898""2026-10-19T19:35:16.296Z"false"<p>No. Per Section 33 09 00, Paragraph 1.03.A, as revised by Addendum No. 1, all SCADA system integration work shall be performed by Control Panels USA (CPUSA). This requirement reflects the City of Leander’s standardization of its existing SCADA system and is not subject to substitution or “or equal” provisions.</p>""e5002b5d-ec2e-419f-ab95-4efe02b92954""2026-10-22T22:34:19.244Z"false"<p>See the attached pre-bid meeting agenda document, a site visit is scheduled for 3 - 4 PM, 10/27/2026.</p>""efbfe7c5-7b51-45bd-bd5f-d511e3023abf""2026-10-26T14:10:34.62Z"false"<p>The new flow meter is to be installed in a new concrete meter vault, between the new Filter #3 and the proposed Chlorine Contact Basin #3, see callout on Plan Sheet 8. <span class=\"ql-cursor\"></span></p>""53dc4767-b437-4c49-b9f6-f89dce436f74""2026-10-26T14:34:05.529Z"false"<p>All testing is incidental to bid items. The Contractor may select the third party testing agency per the Specifications. If there is specific information needed, please direct the testing agency to reach out to GBA.</p>""037cdfbb-2c5c-48f0-9047-913f5064e171""2026-10-29T17:03:55.404Z"false"<p>An approved list of manufacturers will not be provided. Manufacturers that conform to the plans and specifications are acceptable. Please note that the new hypochlorite day tank must fit with existing equipment (see Sheet 14).</p>""456bad94-f964-4741-a85a-44658a19e751""2026-10-29T17:04:13.474Z"false"<p>This has been posted.</p>""47f843ca-6db8-4257-ab3a-5bc3b7f3b7d4""2026-10-29T17:04:23.951Z"false"<p>Please disregard the instruction given at the pre-bid meeting. A Statement of Qualifications is <strong>not</strong> required with the bid. As stated in the Instructions to Bidders, the qualification form will be provided to the apparent low bidder, and it must be submitted within five (5) calendar days after notification. The Instructions to Bidders govern.</p>""7288a418-750b-45a6-a944-42d832332a2f""2026-10-29T17:06:32.913Z"falseRead from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.