We'll email you new asphalt opportunities in Texas as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The project includes:
Improvements to pedestrian access infrastructure across four locations in the City of Tyler including W 32nd Street, Elkton Trail, E Rieck Road, and Stonebridge Way. Improvements include but not are not limited to installation of sidewalks, ramps, driveway replacements, and a bus stop pad.
Type of work: Sidewalk Construction and Driveway Rehabilitation
Engineer's estimate: 600,000.00
Pre-bid meeting: October 23, 2026 at 9:00 AM (Chicago) — Tyler Engineering Services Building - TWU Conference Room 511 W Locust St, Tyler, TX 75702 — Non-Mandatory
Bid opening: November 10, 2026 at 2:00 PM (Chicago) — City Hall - 2nd Floor 212 North Bonner Avenue, Tyler, TX 75702
Questions due: November 5, 2026 at 2:00 PM (Chicago)
Questions asked: 10
See Notice to Bidders for additional bidding requirements.
Bid documents (download requires a free CivCast account):
Improvements to pedestrian access infrastructure across four locations in the City of Tyler including W 32nd Street, Elkton Trail, E Rieck Road, and Stonebridge Way. Improvements include but not are not limited to installation of sidewalks, ramps, driveway replacements, and a bus stop pad.
"<p>The non-mandatory pre-bid meeting will be in-person only.</p>""b969cb81-0e81-4023-8bb9-8e8d0c51688c""2026-10-19T22:45:04.83Z"false"<p>Anticipate start date will be early January.</p>""c7a4096e-c8d4-493a-8a7a-43b0239c99ba""2026-10-23T15:15:59.032Z"false"<p>Bids are due 11/10 at 2:00 pm. We will be issuing an addendum in the following week to formally update the spec.</p>""a90b555c-2783-420a-b4bd-695813e10145""2026-10-23T15:17:09.286Z"false"<p>Permit fees will be waived.</p>""a5b7cb3b-997f-4d92-b64f-462118a2bcb6""2026-10-26T18:36:40.947Z"false"<p>Yes, a traffic control plan will be required to be submitted a minimum of two weeks prior to mobilization. See traffic control notes 1 & 2 on sheet G2.</p><p></p>""0efd9144-976d-49cc-a766-1b2a52716a5b""2026-10-30T15:34:34.747Z"false"<p>All landscaping and vegetation shall be trimmed or removed as necessary to maintain required pedestrian clearances, see general note 22 on sheet G2. Bid item 24 includes preparation and implementation of the tree protection plan, and arborist coordination if required. The Contractor’s tree protection plan should include all conflicts with the proposed work and mitigation measures. The Contractor should assume large root or branch pruning will require arborist oversight.</p><p></p>""5905d27e-b1e3-4613-96e0-876a1a6fc351""2026-10-30T15:35:12.25Z"false"<p>Only those items listed in the bid form will be measured and paid for at the unit price. All other work will be considered subsidiary and be included in the unit price for the various bid items. See general note 5 on sheet G2 and General Measurement Requirements note D in Section 17 – Special Conditions.</p><p></p>""505d8994-3767-451e-b4d3-f74dd6733c56""2026-10-30T15:35:33.817Z"false"<p>Franchise utility companies will be required to absorb the cost of the relocations based on right-of-way agreements with the City. </p><p></p>""6314d5de-8443-49cd-aa9a-3d4f7e5bf5db""2026-10-30T15:38:52.913Z"false"<p><span style=\"color: black;\">The City will begin contacting the franchise utility companies to give them advance notice, but the contractor is ultimately responsible for coordinating with franchise utility companies to relocate their infrastructure as needed.</span></p>""b3e6df9e-00d5-43d6-86dd-7dcccf6af0cc""2026-11-03T02:36:58.335Z"false"<p>We will break out the two finishes into separate bid items. Plans, bid form, and bid item descriptions will be updated in a second addendum and posted end of week.</p>""367865b5-07c7-4ca9-af40-85d4c0cb46ff""2026-11-03T02:40:58.519Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.
Source: CivCast (project 6abfe0145c03ac6057a8ee56), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.