The Work for this proposed project consists of furnishing all materials, labor, equipment, tools and incidentals necessary to construct, in accordance with the plans and specifications, the Highland Shores Boulevard Road Reconstruction Project in the City of Highland Village. from Twin Coves Drive/Hillside Drive to 200’± West of Lake Cove This project generally consists of removal of existing concrete and asphalt pavement and construction of approximately 4,100 linear feet of concrete street pavement, approximately 8,350 linear feet of concrete sidewalk, drainage facilities, culverts, driveway approaches, and miscellaneous appurtenances.
Type of work: Concrete Road Reconstruction
Bid opening: November 12, 2026 at 2:00 PM (Chicago) — 1000 Highland Village Road, Highland Village, Texas 75077
Questions due: November 9, 2026 at 5:00 PM (Chicago)
Questions asked: 9
Bid documents (download requires a free CivCast account):
The Work consists of furnishing all materials, labor, equipment, tools and incidentals necessary to construct, in accordance with the plans and specifications, the Highland Shores Boulevard Road Reconstruction Project from Twin Coves Drive/Hillside Drive to 200'± West of Lake Cove. This project generally consists of removal of existing concrete and asphalt pavement and construction of approximately 4,100 linear feet of concrete street pavement, approximately 8,350 linear feet of concrete sidewalk, drainage facilities, culverts, driveway approaches, and miscellaneous appurtenances.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Project Manual has been uploaded.</p>""dd2af82c-788f-486b-83e6-a04e1edf0cea""2026-09-29T17:49:27.764Z"false"<p>See Project Manual Section: "SPECIAL PROVISIONS" 41. <u>SAMPLES AND TEST OF MATERIAL</u></p><p></p><p class=\"ql-align-justify\">\t<em>“The Contractor shall designate and pay a recognized testing laboratory to perform all testing for this project. Such designation shall be subject to the approval of the City. All testing services that the Contractor is required to provide will not be paid for separately, but shall be considered subsidiary to other items of work.”</em></p><p></p>""6a849078-c395-4011-a8f8-4721747ec804""2026-10-08T15:42:54.258Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">See Project Manual Section: "SPECIAL PROVISIONS" 38. </span><u style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">CONTRACT TIME</u></p><p></p><p class=\"ql-align-justify\"><em>"The Contractor shall complete construction within four hundred and eighty (480) calendar days from the date of beginning specified in the Notice to Proceed."</em></p><p></p>""6c7b7c5c-307e-40a1-9fb9-cd82771a38cd""2026-10-08T15:44:41.905Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abb1004da39a631109f7f93), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.