EL PASO LIFT STATION PIPING REPAIR
The contractor shall provide all personnel, equipment, supplies, tools, parts, materials, supervision, and other resources necessary to complete the demolition and removal of the existing lift station south sewer pump line in mechanical room C106 at the El Paso VA Main Clinic, as well as the installation of new schedule 80 piping and reinforce flanges to replace existing south sewer pump line. All work must be performed after hours. The contractor must replace the existing damaged south sewer pump piping with Schedule 80 piping, replace all broken flanges with Schedule 80 reinforced flanges, provide adequate supports for the new piping using welded connections, comply with confined space requirements, provide pump services to extract all debris and sewage from the lift station, and provide proper disposal of all materials and equipment.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""WD 2015-5229 rv.31 dtd 08-27-2026 El Paso County.pdf"44400"file"".pdf""1""2026-10-07T16:35:55.482+00:00""9bbda6282b254d2f862d086282871ac7""public""0""public""b3a45c83b2884db5926e304573575a6c""0"3"0""Layout.pdf"218751"file"".pdf""1""2026-10-07T16:35:55.482+00:00""1593a6f1ba7c4186bc2bcaefc4afafae""public""0""public""924d98aa5d314a7bb7942d36c2864aca""0"2"0""Solicitation 36C25727Q0040.pdf"520836"file"".pdf""1""2026-10-07T16:35:55.482+00:00""df86be5763cc460a814fb48e55527c42""public""0""public""9f141eefb7404d06a64db33416ed20be""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7e1e5eeb7c5a4ae0aa5292ca8fe78c45), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.