The project scope includes but is not limited to the construction of a new 5 MGD lift station including wetwell with three (3) submersible pumps, valve vault, electrical service, emergency generator, yard piping with other site improvements and appurtenances, and demolition of existing lift station .
Pre-bid meeting: October 1, 2026 at 10:00 AM (Chicago) — virtual — https://teams.microsoft.com/meet/213830694966869?p=KYy0i4tNrrk05VXi5e Meeting ID: 213 830 694 966 869 Passcode: Be2Mo65e
Bid opening: October 29, 2026 at 2:00 PM (Chicago) — 11000 Frisco Street, Suite 400, Frisco, Texas 75033 — Westwood Professional Services
Questions due: October 27, 2026 at 4:00 PM (Chicago)
Questions asked: 4
Bid documents (download requires a free CivCast account):
The project scope includes but is not limited to the construction of a new 5 MGD lift station including wetwell with three (3) submersible pumps, valve vault, electrical service, emergency generator, yard piping with other site improvements and appurtenances, and demolition of existing lift station.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>the geotech is in the appendix of the specs</p>""209b2ace-4ec5-4d4c-9251-1d37cd258e02""2026-09-24T21:34:14.522Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a90a4118b7358ffba0b3322), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.