The U.S. Army Corps of Engineers Galveston District plans to issue an unrestricted RFP for widening and deepening the Houston Ship Channel from Boggy Bayou to Sims Bayou in Houston, Texas.
The estimated price range is between $100,000,000 and $250,000,000.
The solicitation is tentatively scheduled to be issued on or about October 2026 with proposals due approximately November 2026.
The work includes widening the channel to approximately 530 feet, deepening from -41 feet to -46.5 feet, constructing the Beltway 8 placement area, and removing abandoned pipelines and a bulkhead.
The contract is Firm-Fixed-Price with a base term of 477 days after NTP and up to 603 days if all five options are exercised.
The source selection procedure will be Lowest Price Technically Acceptable (LPTA).
Requirement: Offerors must be registered with the Systems for Award Management (SAM) in order to receive a government contract award.
Est. value
between $100,000,000…
Term
Base contract 477 days…
Method
Request for Proposal (RFP)
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.Estimated at $250M — that’s Propeller’s audited program ($100M+). One free application, soft pull.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Base contract 477 days after NTP; total with options 603 days after NTP
Category
Construction · NAICS 237990
Posted
Sep 24, 2026
Source
SAM.gov
What this bid is asking for
AI-generated
Widen the main Houston Ship Channel to approximately 530 feet up to the Greens Bayou confluence.
Deepen the navigation channel from -41 feet to -46.5 feet between Boggy Bayou and Sims Bayou.
Complete construction of the Beltway 8 placement area and prepare/utilize designated upland placement areas (Beltway 8 and East and West Clinton sites) to receive dredged material.
Remove abandoned pipelines and a bulkhead.
Submit a Firm-Fixed-Price proposal via the PIEE Solicitation Module.
Requirements
From the documents
Estimated value
between $100,000,000 and $250,000,000
Posted Scope of Work
See attachments
Scope, read from the documentsAI-generated
The work consists of widening the main Houston Ship Channel to approximately 530 feet up to the Greens Bayou confluence, deepening the navigation channel from -41 feet to -46.5 feet between Boggy Bayou and Sims Bayou, and completing the construction of the Beltway 8 placement area. This involves preparing and utilizing designated upland placement areas (Beltway 8 and the East and West Clinton sites) to receive dredged material, and removing abandoned pipelines and a bulkhead. The contract is divided into a Base Contract and five Options.
More excavating bids in Texas, weekly.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: SAM.gov (notice a3643222c33c4c7490c317445d3c3424), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.