Construction of a parking lot expansion for the Public Safety Building, including grading, paving, drainage, utilities, landscaping, irrigation, and hardscape improvements.
Engineer's estimate: $972,000.00
Pre-bid meeting: September 29, 2026 at 2:00 PM (Chicago) — City of Melissa City Hall - 3411 Barker Avenue, Melissa, Texas 75454
Bid opening: January 26, 2027 at 2:00 PM (Chicago) — City of Melissa City Hall - 3411 Barker Avenue, Melissa, Texas 75454
Questions due: October 20, 2026 at 5:00 PM (Chicago)
Questions asked: 10
Bid documents (download requires a free CivCast account):
Construction of a parking lot expansion for the Public Safety Building, including grading, paving, drainage, utilities, landscaping, irrigation, and hardscape improvements. The project includes 34 covered parking spaces with a canopy structure, with Absolute Steel Texas specified as the manufacturer for the canopy.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Contractor will pay for water usage. </p>""d465f59a-0cd1-4930-a3aa-ac6f0ba98477""2026-08-21T13:50:53.696Z"false"<p>Contractor will pay for materials testing.</p>""73cdc0b0-d65c-41d5-815b-8290420a8118""2026-08-21T13:50:56.203Z"false"<p>It takes roughly a month to a month and a half to award the project after bids are received.</p>""a1925a78-1ebc-4fce-810e-ee90b9f4cd32""2026-08-21T13:50:59.525Z"false"<p>We are not aware of any franchise utility conflicts on the site. </p>""638c6f2d-06f2-4416-8da0-d2ada398aa92""2026-08-21T13:51:06.757Z"false"<p>The prebid meeting is not mandatory. </p>""ca9d39c1-daa2-4d4f-97cc-52d29a9afb72""2026-09-14T13:42:04.197Z"false"<p>All 34 proposed parking spaces located at the rear of the building will be covered parking. In Bid Item Description for #M3, we have specified <strong>Absolute Steel Texas</strong> as the manufacturer because we coordinated with them during the design phase and they are already familiar with the project. They provide the structural design, foundation design, and other engineering requirements specific to the proposed parking layout. We also stated or approved equal if GC’s want to go a different route, but it would need to be approved beforehand. I hope this clarifies the intent.</p><p></p>""38d7c025-ea3a-44c9-9666-d36dab746059""2026-09-17T21:56:42.93Z"false"<p>That is correct, when using Absolute Steel, they provide all structural design for the canopy as part of their package deal so it would be included on their estimate as a line item.</p><p> (a) Contractors will need to coordinate with Absolute steel to get this information. </p><p> (b) We will upload an addendum before the end of this week that will address this question. </p><p> (c) Contractors will need to coordinate with Absolute steel to get this information. </p><p> (d) Contractors will need to coordinate with Absolute steel to get this information. </p>""679d771a-7efb-46ec-a4e3-55250b96c798""2026-10-14T19:39:25.992Z"false"<p>More than likely, there will be a permit requirement for the canopy structure, a third-party inspection team will come out and do the structural inspections for the city. So yes, this would be the contractor's responsibility to pay and obtain the permit. </p>""7e990756-d67a-4820-932a-2d2e5e647aac""2026-10-14T19:39:32.352Z"false"<p>The addendum will be uploaded before the end of this week.</p>""a79bf2b0-0a23-4ee7-92cd-e69c7a50a5de""2026-10-14T19:39:34.576Z"false"<p>Liquidated damages would be $1,000.00 per day. </p>""b596fd36-4056-47b1-957e-e8644449cf59""2026-10-15T18:23:20.354Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a876fd36520d9b37af137d2), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.