BAYPORT WATERLINE REPLACEMENT PHASE IV PROJECT
Sealed bids will be received until **10:00 a.m., local time, on Thursday, October 22, 2026, **by the Coastal Water Authority (CWA), located at 1801 Main Street, Suite 800, Houston, Texas 77002, at which time and place the bids will be publicly opened and read aloud. Bids received after this time will be returned unopened.
Items or services: The Bayport Waterline Replacement Phase IV Project consists of the replacement of critical water transmission infrastructure within existing public rights-of-way, utility easements, and Coastal Water Authority (CWA)-owned property.
The Work generally includes:
The improvements are intended to enhance the reliability, resiliency, and operational flexibility of the transmission system while maintaining existing system capacity. Refer to the Technical Specifications and other Contract Documents contained in the Project Manual for a complete description of the Work and project requirements.
A mandatory pre-proposal meeting will be held on Tuesday, August 4, 2026, at 10:00 a.m. (local time) at the Coastal Water Authority (CWA) Downtown Office at 1801 Main St, Suite 800, Houston, Texas 77002. Attendance is required for all prospective proposers. Refer to Section 0210 of the Project Manual for additional information regarding the site visit.
Bids must be submitted on the Official Bid Form provided in the Bid Documents. Bids must be clearly marked on exterior of bid envelope as: “SEALED BID, BP-140”. Bid Documents (including specifications) may be obtained from Civcast (www.civcast.com).
This Project is contingent upon the release of funds from the Texas Water Development Board (TWDB).
This procurement and any contract awarded under this Invitation to Bid (ITB) are expected to be funded, in part, through financial assistance from the Texas Water Development Board (TWDB). Neither the State of Texas nor any of its departments, agencies, or employees shall be a party to this Invitation for Bids or any resulting contract.
All contracts awarded under this Invitation to Bid are subject to the United States Iron and Steel (USIS) requirements of Texas Government Code, Chapter 2252, Subchapter G, as applicable.
The Coastal Water Authority reserves the right to reject any or all bids and to waive any informalities or irregularities in the bidding process whenever such action is determined to be in the best interest of the Authority.
Pre-bid meeting: August 4, 2026 at 10:00 AM (Chicago) — 1801 Main St, Suite 800, Houston, Texas 77002
Bid opening: October 22, 2026 at 10:00 AM (Chicago) — 1801 Main St, Suite 800, Houston, Texas 77002
Questions due: October 9, 2026 at 4:00 PM (Chicago)
Questions asked: 50
Bid documents (download requires a free CivCast account):
The project consists of replacing approximately 15,750 linear feet of 8-inch through 24-inch transmission waterlines, replacing the existing 48-inch magnetic flow meter at the Bayport Pump Station, replacing valves, fittings, air release valve assemblies, and associated appurtenances, performing trenchless installation at designated roadway and railroad crossings, and conducting testing, commissioning, and site restoration.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>There are numerous gas pipelines located throughout the project area. While HDPE pipe bursting may provide a more economical installation method, open-cut construction is the recommended approach in these areas due to the reduced risk of impacting existing utilities. Contractors are encouraged to prepare their bids based on the construction methods and details presented in the contract documents.</p>""115d5ff4-5b18-452f-8231-2a9d01daf4e9""2026-08-03T16:41:21.214Z"false"<p><span style=\"font-size: 12pt;\">The Project Plans and Specifications are anticipated to be uploaded by 12:00 p.m. (Local Time) on Monday, July 20, 2026.</span></p>""6a5a9d12977f751f788a5229""2026-07-17T21:22:26.258Z"false"<p><span style=\"font-size: 12pt;\">The revised documents have been uploaded. We apologize for any inconvenience this may have caused. Thank you for your understanding.</span></p>""6a5fd162b23f8d07b825eaaa""2026-07-21T20:06:58.854Z"false"<p>Yes, the bid form is being revised to show the FFRP item. </p>""2ff4fa0b-9b93-45fa-92d6-3b8474af221d""2026-08-03T16:42:19.674Z"false"<p>The sheets are being revised to show 16" FFRP. An updated set of plans will be provided to show the new call outs. </p>""f0391804-4e99-46cf-9524-86585a3edc2c""2026-08-03T16:43:20.395Z"false"<p>A project location map will be uploaded to CivCast for the Contractor to understand the exact location of the proposed waterline improvements.</p>""e9cf49e9-a3fe-4de9-bb9e-3295a640150c""2026-08-03T16:43:54.568Z"false"<p>The final geotechnical report by Aviles Engr. Corp will be uploaded to CivCast for all Bidders to review and include in bids.</p>""c07ce161-eadf-4411-b5e3-fbf95dc729ba""2026-08-03T16:44:18.565Z"false"<p>Contractor to make a good faith effort to meet the 12% MBE & 8% WBE participation goals.</p>""ff2c89b3-f4b4-4024-9996-90104f9a25b6""2026-08-03T16:44:40.67Z"false"<p>A project location map will be uploaded to CivCast for the Contractor to understand the exact location of the proposed waterline improvements.</p>""d5e62a1c-d1de-4e9a-a4e2-3d0e15041a38""2026-08-03T16:45:02.679Z"false"<p>Contractor to make a good faith effort to meet the 12% MBE & 8% WBE participation goals.</p>""879e6e6b-d239-4923-8d27-dd84c2afef0d""2026-08-03T16:45:15.942Z"false"<p>ESA PH I will upload to CivCast for Contractor to review.</p>""3974bb81-278d-4919-ab81-e44425753a3d""2026-08-03T16:45:36.705Z"false"<p>Information pertaining to the removal and replacement of the existing mag meter will be uploaded to CivCast.</p>""c6bfc67e-89af-4a93-9492-88769e2d67e0""2026-08-03T16:45:51.098Z"false"<p>The Engineer of Record will obtain all the required LONO’s from the existing pipeline companies.</p>""444e0d04-baab-42f3-b409-cd20eb222d53""2026-08-03T16:46:07.125Z"false"<p>Information pertaining to the removal and replacement of the existing mag meter will be uploaded to CivCast.</p>""dc98ebc3-4c41-43bc-97f9-0e21761cf10c""2026-08-03T16:46:29.737Z"false"<p>It is expected to retain the existing concrete vault. The Mag meter bypass sheets are currently being revised and will be included in the addendum</p>""d4abcacc-54f2-4463-87ad-de81972b3c5e""2026-08-03T16:46:44.975Z"false"<p>Yes, a revised bid form will be included in the addendum</p>""33a2931c-0964-4330-8396-d1a4e97e4d45""2026-08-03T16:46:53.138Z"false"<p>The final geotechnical report will be included in the addendum.</p>""d5385cfd-a97f-4af0-a2d0-a22417d7406e""2026-08-03T16:47:02.974Z"false"<p>The centerline of the proposed pipe is to be constructed at a minimum of 5' from the edge of pavement.</p>""85cd6509-11ba-4f8c-8e8b-bbee058c36e5""2026-08-03T16:47:13.807Z"false"<p>The Mag meter bypass sheets are currently being revised and will be included in the addendum. The sheets include a reduction in the size of the pipes utilized for the bypass.</p>""7b1cd273-c066-4d2c-9f48-f3c4ab5c5791""2026-08-03T16:47:22.283Z"false"<p>Primus Liner. </p>""cfdfccdb-ece4-4e6f-ba65-1de199d2e2fb""2026-08-17T14:52:34.866Z"false"<p>The Owner will respond to the questions once the necessary verification has been completed.</p>""1664c260-0397-4a6b-bcaf-ef88e0bd0bd3""2026-08-17T14:54:39.156Z"false"<p>The linear footage is approximately 152 linear feet.</p>""197a3403-40ac-4c0f-a611-7534154add68""2026-08-17T14:55:12.701Z"false"<p>It is anticipated that work will be performed within the 14' easement along Corridor 50. </p>""3c399a20-e4fe-4563-963c-80ee45e0e46c""2026-08-17T14:56:14.169Z"false"<p>A recommended bypass has been designed, and an addendum will be issued shortly. As-built drawings identifying the location where the magnetic flow meter is to be replaced will be uploaded to the Documents section following issuance of the addendum.</p>""ffa4d2f7-cf6c-4dc3-a311-5dcac62e5523""2026-08-17T15:00:22.931Z"false"<p>A separate solicitation for testing laboratory services will be conducted. Contractors should contact CWA separately regarding testing laboratory services, as they are not included in this solicitation.</p>""2993cb84-f232-4a1e-8805-2a3319b560ce""2026-08-17T15:07:28.891Z"false"<p>Thrust blocks are required at the locations specified in the plans.</p>""f8826924-2a25-4ea0-9242-d5f92fbce490""2026-08-17T15:08:21.573Z"false"<p>No separate payment will be made for the installation of water line markers. The cost shall be included in the unit price for the water lines.</p>""0a6d52ca-24a8-4902-8722-7536b7a352ec""2026-08-17T15:08:54.527Z"false"<p>Additional PVC pipe for repairs will be added to the “Extra Work Items” in an upcoming Addendum.</p>""15dc9231-1609-4308-8b8b-76df0c34a30c""2026-08-17T15:10:38.635Z"false"<p>It is recommended that the gate valves be removed and properly disposed of.</p>""67597e1e-5313-413d-9997-a1c9ee09234f""2026-08-17T15:11:36.042Z"false"<p>Additional work items will be added for trench backfill, pavement repair for this area will be included in Addendum 2.</p>""c4a45a87-cff8-4dfe-9f7d-17718854e36e""2026-08-17T15:13:36.294Z"false"<p>The City of La Porte owns the fire hydrants and 8-inch water line along Bay Area Blvd. There are no fire hydrants connected to the 16" CWA water line.</p>""9f57fd83-49c9-4d90-9050-2d4f20a8e18b""2026-08-17T15:13:54.289Z"false"<p>The table of contents list sheet 65 as the location of the table within the plan set.</p>""f96c90b8-ee3c-42c9-bc18-fa3449a5bd84""2026-08-17T15:16:13.3Z"false"<p>The selected method of construction has not been determined by CWA. It is recommended that each bidder provide costs for each alternative.</p>""30558cfe-c3a8-40cf-b1de-5e161e6d513d""2026-08-17T15:16:50.622Z"false"<p>See water distribution line bedding and backfill for open cut trenches detail on sheet 68.</p>""67b322c7-38d8-4546-afa5-1b42d5da47cc""2026-08-17T15:17:04.91Z"false"<p>Stainless steel</p>""94700863-4c83-4f9a-b926-b54560e3ebb3""2026-08-17T15:17:13.742Z"false"<p>It is intended that Bay Area Blvd East, Bay Area Blvd South and pump station are to be awarded together, Corridor 50 can be awarded separately.</p>""77b575bd-dff6-4159-a13e-0201178b92aa""2026-08-17T15:17:22.5Z"false"<p>The Owner will respond to the questions once the necessary verification has been completed.</p>""4697a12a-0a67-41f5-a618-2bbac8082f3a""2026-08-17T15:17:51.606Z"false"<p>See Addendum No. 1. </p>""1fecb5ee-503b-4b22-a3fc-b90d99e873cf""2026-08-18T00:34:11.98Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.