Hopple Street HAM CR 163 5.5 - PID 121735
The work includes furnishing all materials, labor and equipment for the Victory Parkway Safety Improvement Project, with line items for contract bond, contract contingency, reinforcing steel, dowel holes, sealing concrete surfaces, concrete repair by epoxy injection, sealing concrete bridge decks with HMWM resin, structural expansion joints, armorless expansion joints, sidewalk expansion joint cover plates, patching concrete structures, vandal protective fence repair, concrete walk, concrete curb repair, work zone impact attenuators, maintenance of traffic, law enforcement officer with patrol car, field office, portable concrete barrier, pavement markings (stop line, lane arrow, channelizing line, edge line, lane line, guide line, center line), erosion control, surface preparation using hydrodemolition, existing concrete overlay removal, superplasticized dense concrete overlay, hand chipping, test slab, full-depth repair, removal of debonded or deteriorated existing variable thickness concrete overlay, project signs, removing bird excreta, bird netting/spikes, chipping of loose concrete substructure, cleaning of bridge inlets, cleaning of downspouts, debris shields, and other related items.
We post new other opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: Division Of Engineering (solicitation ITB-233-273C909409-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.