The Contractor shall provide all materials, labor, bonds, licenses, insurance, equipment, tools, permits, taxes, transportation, and fees to replace failed compressor, condenser coil, and install manufacturer approved hail guard on Building 1s rooftop HVAC unit, including all refrigerant handling, testing, crane operations, coordination, documentation, and restoration to full operational cond. All work shall be in accordance with the terms, conditions, and requirements of this Invitation for Bid (IFB). Bid submissions shall be emailed to PWC@cmd.ca.gov and shall include the Contracting Administrator listed in this IFB as a copied recipient. Subject line must include the IFB No. 133847, HVAC Condenser Coil, Compressor, & Hail Guard Repair Bldg. 1 and Contractor Business Name. Prospective bidders MUST attend the mandatory pre-bid job walk on 10/26/2026, at 10:00 AM at Joint Forces Training Base, 11200 Lexington Drive, Los Alamitos, CA 90720. Arrive at least 15 minutes early and bring business cards. Failure to arrive at the designated meeting location by the scheduled start time may result in disqualification from submitting a bid. Bidders who do not remain for the entire pre-bid job walk may be considered non-responsive and may not be allowed to bid on this project. Prospective bidders may obtain directions to the pre-bid job walk site by contacting Jordan Bernal at Jordan.Bernal@cmd.ca.gov. The prime contractor MUST possess a type C-20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor license. All questions regarding this IFB MUST be submitted to Jordan Bernal at Jordan.Bernal@cmd.ca.gov no later than 5:00 PM on 10/28/2026. Email subject lines must reference IFB No. 133847. If an addendum is necessary, it will be issued prior to the Bid Submission Deadline. The bid opening will be held on 11/4/2026 at 2:15 PM. HVAC Condenser Coil, Compressor, & Hail Guard Repair Bldg. 1 PRE-BID JOB WALK: 10/26/2026 at 10:00 AM Q&A END: 10/28/2026 at 5:00 PM BID SUBMISSION DEADLINE: 11/4/2026 at 2:00 PM BID OPENING: 11/4/2026 at 2:15 PM
Sell Event / RFx · Event version 1 · Department: California Military Department · Event ID: 0000040691
UNSPSC categories:
The contractor shall provide all materials, labor, bonds, licenses, insurance, equipment, tools, permits, taxes, transportation, and fees to replace failed compressor, condenser coil, and install manufacturer approved hail guard on Building 1s rooftop HVAC unit, including all refrigerant handling, testing, crane operations, coordination, documentation, and restoration to full operational condition.
We post new hvac opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Cal eProcure (event 0000040691), retrieved via California's Cal eProcure statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.