The State of Utah is seeking statements of qualifications for engineering design and CM/GC preconstruction services for the replacement of the West Lake Wastewater Pump Station, to be relocated for a highway overpass project in Utah.
Requirement: No specific licensing, prequalification, participation goals, bonding, insurance, liquidated damages, or prevailing wage requirements are stated in the source.
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.One free application, soft pull — sized to your work.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Submit a statement of qualifications for engineering design services.
Submit a statement of qualifications for CM/GC preconstruction services.
Address the replacement of the West Lake Wastewater Pump Station, including relocation for a highway overpass project.
Posted Scope of Work
Statements of qualifications sought for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station, to be relocated for a highway overpass project.
More electrical bids in Utah, weekly.
We post new electrical opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is being procured?
Statements of qualifications are sought for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station, to be relocated for a highway overpass project.
Where is the work performed?
The place of performance is UT (Utah).
What is the due date for submissions?
The due date is 2026-10-22, with a closing time of 10/21/2026 07:00 PM EDT.
Full source recordEvery field State of Utah (BidNet Direct) published, untouched
Teaser
Ai Overview
Statements of qualifications sought for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station, to be relocated for a highway overpass project.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: State of Utah (BidNet Direct) (bid UT-444190025688), retrieved via the Utah BidNet Direct purchasing portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.