The work is extending two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main, in Utah.
The pre-qualification request was posted on 2026-11-20 and responses are due by 2026-12-09 at 04:00 PM EST.
The issuing agency is the State of Utah.
This is a Request for Pre-Qualifications for Phase 1 of the MP12 B and C - 500 South Capacity Upgrades project, using a CMGC (Construction Manager/General Contractor) method.
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Submit a response to a Request for Pre-Qualifications for Phase 1 of the MP12 B and C - 500 South Capacity Upgrades project.
Demonstrate qualifications to extend two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main.
Respond by the closing date of 12/09/2026 at 04:00 PM EST.
Posted Scope of Work
This project involves extending two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main to be added as flow conditions demand.
Scope, read from the documentsAI-generated
The work consists of extending two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main to be added as flow conditions demand.
More plumbing bids in Utah, weekly.
We post new plumbing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is the project?
The project involves extending two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main to be added as flow conditions demand.
Where is the work performed?
The place of performance is UT (Utah).
When is the response due?
Responses are due by 12/09/2026 04:00 PM EST.
Who is the issuing agency?
The issuing agency is the State of Utah.
Full source recordEvery field State of Utah (BidNet Direct) published, untouched
Teaser
Ai Overview
This project involves extending two 24-inch force mains from an existing sewer pump station to a discharge point upstream of a lift station, with provisions for a third force main to be added as flow conditions demand.
Issuing Org
Locked Registered members only
Closing Date With Time
12/09/2026 04:00 PM EST
Listing
Title
Request for Pre-Qualifications | Phase 1 | MP12 B and C - 500 South Capacity Upgrades - CMGC
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: State of Utah (BidNet Direct) (bid UT-444241541743), retrieved via the Utah BidNet Direct purchasing portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.