Change Order to increase cost due to additional labor and materials required to install gutters and downspouts.
The added work furnishes and installs 80 feet of 7-inch 24-gauge prefinished steel dark bronze gutters, 30 feet of 5-inch square corrugated prefinished steel downspouts, 6-inch prefinished steel edging and sill flashings, and 5-inch under-gutter closure flashing, including cutting back the existing roof edge flush with a new 2x8 painted skirt board, plus removing rot from the top side of the door lintel beam, treating with Abatron LiquidWood epoxy and filling with Abatron WoodEpox, for $35,182.00 for gutters and $2,000.00 for lintel repair for a total addition of $37,182.00 with 14 added contract days.
We post new gutters opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: BidBuy (Illinois) (bid 27-422DNR-REALT-B-54809), retrieved via the Illinois BidBuy open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.