SEE ATTACHMENTS
The contractor shall perform teardown, evaluation, repair and/or modification of the POWER SUPPLY (NSN 7HH 6130-01-520-5554) in accordance with the technical requirements in Sections C, D, E, and attachments. All repair work shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed. The contractor must comply with MIL-STD-130 marking, MIL-STD-2073 packaging, and CAV reporting requirements. The required Repair Turnaround Time (RTAT) is 60 DARO, and Government Source Inspection (GSI) is required.
We post new goods & materials opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"17050-0788""MECHANICSBURG""PA""USA""P O BOX 2020""5450 CARLISLE PIKE""ZAPPPED.N0010426.QQA99.A0000.M0113830.PDF.PDF"640952"file"".pdf""1""2026-04-23T18:06:35.819+00:00""61ff494c73234d1e80a10498232bf8ca""public""0""public""d39e1f2252654d7b82e43b523fb8cfd6""0"1"0"Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 901ee564b16b4f8a9ad165ba1a69fc1d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.