Amendment 0001 is issued to provide Q&A s, updated SOW, and Site Visit information.
The contractor shall provide a complete, device-level inspection and testing program for the facility's hot water boilers, with documentation sufficient for VA, Joint Commission, NFPA, and AHJ review. The work includes two inspection visits per year: a winter/heating season visit testing items marked as '6 month' and a summer/non-heating season visit testing all '6 month' and 'year' items. The contractor must test specific devices as listed in Tables 7.1, 7.2, and 7.3, covering flame safeguard/burner management controls, ignition and flame-proving systems, combustion-air and purge interlocks, gas-pressure switches, automatic fuel safety shutoff valves, operating and high-limit controls, water-flow, temperature, pressure, and low-water safety devices, emergency shutdown circuits, combustion controls, and boiler manufacturer control sequences. The contractor must submit inspection reports including the tables and a report detailing any exceptions or deficiencies.
We post new hvac opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""SOW Boiler Controls Inspection and Testing_Amend 0001.docx"78651"file"".docx""1""2026-11-18T15:31:34.17+00:00""0c5e9a9e8be94ed6999e9301d766482f""public""0""public""c343edf6e5a94e80a2b033d561d64122""0"6"0""36C25027Q0072 Amendment 0001 Q and As.docx"19645"file"".docx""1""2026-11-18T15:31:34.17+00:00""8490d9c2d42c44abab92322bcd13c3b7""public""0""public""6a61d1a933aa4b37958da14f07486423""0"5"0""36C25027Q0072 0001.docx"26963"file"".docx""1""2026-11-18T15:31:34.17+00:00""4c22224f7d2743c28347a183a2635ad0""public""0""public""802981bcd893478db96cee96aa1e8c51""0"4"0""VAAR 852.219-75.docx"20143"file"".docx""1""2026-11-09T21:29:56.793+00:00""f35a30fd5e824cce8aac2418a1658f76""public""0""public""034122ead4864e0cb44a7fa62e24f684""0"3"0""Wage Determination No. 2015-4787 Rev. 34.pdf"258151"file"".pdf""1""2026-11-09T21:29:56.793+00:00""f42e9c784b21449dbd9302580021dbba""public""0""public""17490c67b82441298a52e8c40b6939e7""0"2"0""36C25027Q0072_1.docx"157716"file"".docx""1""2026-11-09T21:29:56.793+00:00""88bc98c062874bd9ba80d10fac34323e""public""0""public""d81dd704d6074f478e5f2516847297c7""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8ca9d947bb91421795ee5ab659ad3b24), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.