This solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76. All work is to be performed at the Bath, NY VA Medical Center.
General scope of work includes:
The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings.
As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed.
The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation.
The contractor shall remove existing flooring in Building 76, Rooms 140 and 140A and install fully welded seam vinyl sheet flooring with 6-inch integral cove base, perform electrical work including relocating the existing feed, extending power conduits and cables and installing a new enclosed circuit breaker and power switches, and provide floor, ceiling and wall structural supports and anchorage for the X-ray equipment. The contractor shall provide all supervision, labor, services, tools, equipment and materials, work in an occupied medical center with restricted and off-hours work as directed, and complete all work within 60 days of the Notice to Proceed.
We post new electrical opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""Site Visit sign in sheet 11-3-20026.pdf"1362588"file"".pdf""1""2026-11-10T18:37:34.666+00:00""570782c8d48a41779cc0433eae1badeb""public""0""public""4f4f3f361ab3457f81d16ddc6635780a""0"8"0""36C24227B0004 0001.docx"25168"file"".docx""1""2026-11-10T18:37:34.666+00:00""b3b375bfee12482f81ec98cec90d4d01""public""0""public""ad6f6b3800924afda897a0b63bcb89ff""0"7"0""LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf"162042"file"".pdf""1""2026-10-29T17:40:32.016+00:00""ba880a3c1d9e479ea05d28d8643e4b5b""public""0""public""e88926697b9843f7b9f4be6022de3daf""0"6"0""BUY AMERICAN ACT CERTIFICATE 52.225-2.pdf"69533"file"".pdf""1""2026-10-29T17:40:32.016+00:00""ad109f7d43dc46869f942259cdb6fe71""public""0""public""c35df93d0cf949e88a2b8f972fb48e1c""0"5"0""528A6-26-607 Contract Drawings.pdf"2382041"file"".pdf""1""2026-10-29T17:40:32.016+00:00""34d767951cd04d99b6166c0322bf466e""public""0""public""fce31220e7bf4091a123563f1902f888""0"4"0""528A6-26-607 Replace Flooring for RM 140 Specification package.pdf"1490373"file"".pdf""1""2026-10-29T17:40:32.016+00:00""e274ef7ab7f845aea64756d577d89e8a""public""0""public""8754f338a7604bab941e42a74ded181d""0"3"0""P07 - WAGE DETERMINATION.pdf"39082"file"".pdf""1""2026-10-29T17:40:32.016+00:00""3ce92106a0b74ccfac81c1b1d7159b53""public""0""public""df43f7cd63b24c56817284af88bb290e""0"2"0""36C24227B0004_1.docx"214876"file"".docx""1""2026-10-29T17:40:32.016+00:00""5e481cf54cf04dd781a335ce9d200218""public""0""public""a44d7c456cc94da59edeb462d123cb13""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8b8ff650dfcf4a708ff6a20369af7de7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.