Amendment A00001 (Q&As)
Teresa Thurston Replacement OSS
The Contractor shall install: 4-inch solid sewer pipe; one underground two-way cleanout; a 1,100-gallon concrete settling tank equipped with an effluent filter, traffic-rated risers, and gas-tight lids; a 1,250-gallon concrete pump tank equipped with traffic-rated risers and gas-tight lids and an effluent pump (Liberty FL70 Series or approved equal) complete with all required controls; 2-inch effluent transport line and manifold; and a gravel trench drainfield with 1.5-inch lateral piping. A gravel-less chamber system may be installed in lieu of the gravel trench drainfield. The Contractor is responsible for all permits, including the Department of Ecology Notice of Intent. The work also includes excavation, trenching, backfilling, compaction, surface restoration, and all appurtenances for a complete and operational system.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""75H70126Q00033-A00001.pdf"655120"file"".pdf""1""2026-09-01T14:28:15.682+00:00""3ffbb241cad74258bcde2fa68b2202f2""public""0""public""e6fee5ffc5e9479a950e9115f42848be""0"9"0""6-US DOL WA20260093 Dated 5-18-2026.pdf"42584"file"".pdf""1""2026-08-21T10:38:58.341+00:00""d455e41d1baf432f8cc08718fa8f11b5""public""0""public""259d73c08720478c8ea2df84da6b2400""0"8"0""5-Measurement and Payment Thurston.docx"19827"file"".docx""1""2026-08-21T10:38:58.341+00:00""3c084ef632644769b498007d2390a0f6""public""0""public""b6fe7e1827804a21be13dd506f3f4d5c""0"7"0""4-Location_Aerial.pdf"830458"file"".pdf""1""2026-08-21T10:38:58.341+00:00""72e2010e6f52486bbb3d6b9281346f90""public""0""public""1416818887df416d8e9f31fe2b81e708""0"6"0""3-OSS Design.pdf"1539490"file"".pdf""1""2026-08-21T10:38:58.341+00:00""e906732ec9d143158cde2234d8590764""public""0""public""0e7d51711c794f9182dacdd4c47e0933""0"5"0""2-Technical Specifications.pdf"249258"file"".pdf""1""2026-08-21T10:38:58.341+00:00""e19adac9839742cd8438e646e850a9f2""public""0""public""95d7db5796e343a3b09a46f93c0f046d""0"4"0""1-Statement of Work.docx"37742"file"".docx""1""2026-08-21T10:38:58.341+00:00""a6fbc6a9d49d4ce8ba6cf0886eaa9f18""public""0""public""0855aa5905e8463f859160e2c30b556a""0"3"0""B01 75H70126Q00033 - Rev.pdf"763801"file"".pdf""1""2026-08-21T10:38:58.341+00:00""30a746f40af944298087543be53bfa42""public""0""public""569e09c967c240b28c4c705a65c3f3de""0"2"0""A11 Pre-Solicitation SAM Notice.pdf"90497"file"".pdf""1""2026-08-21T10:38:58.341+00:00""0fcce3ea102a486ea8c9aee4f191af59""public""0""public""457e57d4251440448de1f39c05675691""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 8848365f1fcd4caba336b7e3ede3c07a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.