All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action.
The contractor shall inspect, calibrate, and lap/repair granite surface tables at Rock Island Arsenal's JMTC. The work includes determining overall and local flatness per ASME B89.3.7, lapping working surfaces back to specification if necessary, affixing calibration stickers, and providing a Service Acceptance Report within three business days. Calibration and lapping shall be performed annually. The contractor must comply with security requirements, AT Level 1 training, and access procedures for the Army installation.
We post new other opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""Solicitation - W519TC27QA007.pdf"3228763"file"".pdf""1""2026-10-15T15:37:26.935+00:00""289a0e7a9c1d46629b46d023c0b1e483""public""0""public""e7c5e26bc6cf4cfd8b9b80837ddf288d""0"2"0""Attachment 0001 - Scope of Work (SOW).pdf"145811"file"".pdf""1""2026-10-15T15:37:26.935+00:00""5e3364c2b57f4f2696731e805ac79e19""public""0""public""a55d212b06aa4b4d923ee860c1512f1e""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 875a18de34a5447591c052d800a17a99), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.