539-23-101 Modernize Nurse Call Statement of Work
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101) All work shall be completed in accordance with the project drawings and specifications.
The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. A full list of requirements and further details are provided in the project drawings and specifications.
The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project.
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101). The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. All work shall be completed in accordance with the project drawings and specifications.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""36C25027B0009.docx"14968"file"".docx""1""2026-11-09T03:07:38.12+00:00""e9ad922c701e42f28f3a91c6546f8d61""public""0""public""9a2ee20ca2834d4bbad50e00876a8184""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 85b83d408f1f422885991142c2734b45), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.