The purpose of this project is to procure comprehensive professional engineering services to conduct a detailed structural assessment and safety coordination review of the existing facility, including an evaluation of the roof structure to determine the feasibility and optimal locations for the installation of permanent fall-protection anchorage points. The study will establish the technical baseline necessary to support future maintenance activities, improve personnel safety, and ensure the continued use of the facility as a safe and reliable operational asset.
Please be aware that open Solicitations will officially published at SAM https://sam.gov/ and the U.S. Embassy Bogotá at https://co.usembassy.gov/es/contratacion/
The Government intends to award a Contract resulting from this solicitation to the lowest priced technically acceptable list of prices. The Government may award the contract based on the initial offer without discussion.
Offerors are encouraged to register in the System for Award Management (SAM) at https://www.sam.gov prior to submitting their quotations/proposals. Registration in SAM is not required at the time of proposal submission.
The guidelines for registration in SAM are also available at: https://co.usembassy.gov/registrese-como-proveedor-de-la-embajada-de-los-estados-unidos-en-colombia/
Electronic Submission/Responses:
Please e-mail your quote to the contracting office listed in this notice prior to the response date and time at BogotaGSOCompras@state.gov.
The contractor shall perform all work necessary to produce a complete set of construction plans and technical specifications for the structural upgrade of the Compound Warehouse and Recycling Center. This includes architectural and engineering design and analysis, construction cost estimates, renderings, photographs, and scale models. The work is divided into phases: Project Initiation, Field Investigation, Technical Evaluation (structural, seismic, and roof anchorage evaluations), Safety & Certification (safety coordination review and engineering certification with 3-option pre-feasibility analysis), Decision Point (Government review and option selection), Detailed Design (of the selected option), Reporting (draft final report and recommendations), and Permit & Closeout (OBO and FAC review, final engineering report and permit package submission). The contractor must also provide consultation services during the construction solicitation period and may be required to provide construction phase services on a time-and-materials basis.
We post new architecture and design opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""QA_19C02026Q0024_Design Compound Warehouse and Recycling Center.pdf"414766"file"".pdf""1""2026-09-01T14:46:59.176+00:00""a459ccd854a94d238b50c04476c76be7""public""0""public""652136d11f2b460281fdf176ae07a2c8""0"4"0""Solicitation_19C02026Q0024.pdf"3188296"file"".pdf""1""2026-08-11T13:21:17.742+00:00""4231940ffef745a1914cf305f4c67d4c""public""0""public""dd58699721ad44089e1703680f1a7602""0"3"0""Cover Letter.pdf"197087"file"".pdf""1""2026-08-11T13:21:17.742+00:00""58675f218da24fbdb298cc2db9c0191b""public""0""public""33b32279d92548c9a5210b3ce4b834cb""0"2"0""CERTIFICACION EXPRESS NDAA- 4.2026.pdf"123334"file"".pdf""1""2026-08-11T13:21:17.742+00:00""43c1d19a550545fbaa35457f138da5c4""public""0""public""be5fe9f0bf5a4d71b16d5a885a77343e""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 856aa11e79014d65bf524e4b40f10d14), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.