St. Marks NWR Aucilla Tram Road Bridge Design-Build
The contractor shall provide design-build services to: (1) provide permanent safe access from the bridge deck or integral platform to all stop-log boards and retaining devices; (2) replace existing timber stop-log boards with heavy-duty aluminum stop logs and install corrosion-resistant retention system operable from above; (3) modify the cantilevered bridge deck and/or extend the WCS operating face as necessary; (4) replace deficient bridge guardrails and traffic-safety features including object markers; (5) trim vegetation obstructing the west-approach load-limit sign; and (6) provide all professional and construction services including field verification, structural evaluation, design, permitting, fabrication, installation, testing, training, and closeout. The design shall maintain structural integrity of existing bridge and WCS, allow routine operation by no more than two trained employees without entering water or crawling beneath the bridge, and comply with FDOT standards.
We post new architecture and design opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22041""Falls Church""VA""USA""FWS Construction & A/E - BIL/Disaster""5275 Leesburg Pike""Sol_140FC126Q0044.pdf"697646"file"".pdf""1""2026-09-08T17:36:43.776+00:00""a354937035334fa6ab7c8bdd7e36a264""public""0""public""801d627c2d684620b180aa2483998696""0"12"0""B08_Solicitation_Attachment_4_Drawings_Specifications_C_41640-00116__2023_INSPECTION_FULL_REPORT_7_18_26_(37_pgs).pdf"10534579"file"".pdf""1""2026-09-08T17:36:43.776+00:00""dc45cca75b47420184ebe23fd29aefe9""public""0""public""8b03382edd1f48ef9d6527ce935fbd59""0"11"0""B08_Solicitation_Attachment_3_Drawings_Specifications_B_Existing_Photos_5_12_26_(6_pages).pdf"3299714"file"".pdf""1""2026-09-08T17:36:43.776+00:00""931dc99d0f3f423d82af8dcfb1ef5011""public""0""public""30134bf416314796b9ac13a1773fd0fe""0"10"0""B08_Solicitation_Attachment_5_Drawings_Specifications_D_41640-00116__1999_Plans_6_14_99_(3_pgs).pdf"6885716"file"".pdf""1""2026-09-08T17:36:43.776+00:00""3045cc567b1c42b09d68abdd8ac53229""public""0""public""220c1ead73c44df7bffef9d4232e8079""0"9"0""B08_Solicitation_Attachment_6_DOL_Wage_Determination__FL20250278___dated_5_18_26_(4pgs).pdf"196913"file"".pdf""1""2026-09-08T17:36:43.776+00:00""453cec981f4d4754acaaa1480ce1237d""public""0""public""4641ab2e19284faab1200bfb0a0bc651""0"8"0""B08_Solicitation_Attachment_8_Conceptual_Design_Illustrations_8_18_26_(3_pgs).pdf"1001663"file"".pdf""1""2026-09-08T17:36:43.776+00:00""5b8bc00152ab4a8abcd6dc1a76f371e0""public""0""public""73c4032818414d6780e57af4d7880217""0"7"0""B08_Solicitation_Attachment_7_Bid_Sheet__8_17_26_(1_pg).pdf"94433"file"".pdf""1""2026-09-08T17:36:43.776+00:00""78d6766b122f426a83cf7e774c728808""public""0""public""80416a9d03e2456594bbfa93b003fd13""0"6"0""B08_Solicitation_Attachment_9_Photographs_of_Site_9_3_26_3_pgs.pdf"1324929"file"".pdf""1""2026-09-08T17:36:43.776+00:00""356fe3aff1614af28530ecd5e3450ded""public""0""public""826607fe0a28412b8176097eb27d3d8e""0"5"0""B08_Solicitation_Attachment_10_WHIPPS_Water_Control_Gates_9_3_26__2_pgs.pdf"2616964"file"".pdf""1""2026-09-08T17:36:43.776+00:00""a913437af43247b389d792e8916f54f1""public""0""public""1cfa5a5c5fcb40f7b1e1f0c2aeeb351e""0"4"0""B08_Solicitation_Attachment_11_Aucilla_Tram_Bridge_Field_Notes_and_Sketch_8_26_26_4_pgs.pdf"5582701"file"".pdf""1""2026-09-08T17:36:43.776+00:00""baefa88392144a6193d7406b613f0a67""public""0""public""4694965d801849e08d30203c332de903""0"3"0""B08_Solicitation_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)_St__Marks_Tram_Rd_Bridge_DB_9_3_26_(19_pgs).pdf"259898"file"".pdf""1""2026-09-08T17:36:43.776+00:00""dd81590b36894b9ebf74bdf6896e3218""public""0""public""b90367b0d89149509b13d4f8b416dc7d""0"2"0""B08_Solicitation_Attachment_2_Drawings_Specifications_A_Project_Location_5_12_26_(1_page).pdf"847917"file"".pdf""1""2026-09-08T17:36:43.776+00:00""9d44cf824ab145cfa664293095a398ec""public""0""public""5608b660aad447068b98806dee26f061""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 3841cb33aab04baba639fd5931532521), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.