PGMB Security Gate - Amendment 3 extends the quote submission deadline from November 9 to November 23, 2026, at 2:00 PM MST.
The contractor shall furnish and install a complete automated vehicular gate system at the PGMB main entrance, including dismantling and removing the existing gate leaves, providing approximately 25 feet of automated gate and 15 feet of chain-link infill to close the 40-foot entrance, integrating with existing card/badge readers and exit loop/coil, verifying and utilizing the existing electrical power source, and providing all interface devices, wiring, and controls. The contractor shall also retrofit two existing automated access gates with AHJ-approved emergency access key switches or equivalent devices, including all wiring, conduit, and mounting hardware. Work includes commissioning, testing, training PGMB personnel, providing O&M documentation, and a minimum 1-year warranty. The period of performance is 90 calendar days from award.
We post new fencing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140RR027R0010_Amd_0003.pdf"205732"file"".pdf""1""2026-10-27T21:05:48.557+00:00""53f42592b3964aeb8548f46539354ce7""public""0""public""5a8067d253a24da3bb644ccdda824b8b""0"8"0""Amendment_3_Combined_Synopsis_Solicitation_PGMB_Entry_Gate_0003.pdf"755622"file"".pdf""1""2026-10-27T21:05:48.557+00:00""f59dea562e744c608c886c8c0bec3668""public""0""public""4652105e60e949d1a005aea2752bc665""0"7"0""Sol_140RR027R0010_Amd_0002.pdf"205730"file"".pdf""1""2026-10-20T20:47:31.259+00:00""cd17f3e91079489dbda82150ad404992""public""0""public""c1745da97e81475792f32bf386b08627""0"6"0""Attachment_1_WD__2015-5485_0002.pdf"44465"file"".pdf""1""2026-10-20T20:47:31.259+00:00""5c35d1c2a0ed46549920faace097acc0""public""0""public""9fb46c03448b4837957aa8b5fa02ba25""0"5"0""Ammendment_2_Combined_Synopsis_Solicitation_PGMB_Entry_Gate_0002.pdf"1037272"file"".pdf""1""2026-10-20T20:47:31.259+00:00""0048f893e23e4d588db490f0254fb52e""public""0""public""2ab73e8e3bb34661a040819d19e6556e""0"4"0""Sol_140RR027R0010_Amd_0001.pdf"205879"file"".pdf""1""2026-10-20T14:16:23.691+00:00""a0de56f368394419911139f2978e66d1""public""0""public""c5a7aa2ff43641709369b961573ade8f""0"3"0""Ammendment_1_Combined_Synopsis_Solicitation_PGMB_Entry_Gate_0001.pdf"749299"file"".pdf""1""2026-10-20T14:16:23.691+00:00""df1ccfedc57e4e1ca95c61daf05e76b0""public""0""public""61bc9d7215264e109634f36a4b1bcfab""0"2"0""Combined_Synopsis_Solicitation_PGMB_Entry_Gate.pdf"722599"file"".pdf""1""2026-10-19T19:39:41.457+00:00""74d6e47f7ada4f2ca4b51fb29e83162d""public""0""public""dd6379146bab4748b2a5e6fae916f833""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7c57681a0efb4d8f916d6f9e0c3ee3c9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.