This amendment provides the Government's responses to questions received regarding the Phase-One solicitation. Please review the attached SF 30 and Questions and Answers PDF.
The Phase-One submission deadline remains unchanged. Offerors shall acknowledge receipt of the amendment as provided in the SF 30. Except as expressly amended, all other solicitation terms and conditions remain unchanged.
Design Build Contract for: NASA Ames Engineering and Mission Operations Facility (EMO) N278
The Solicitation, Phase-One – Request for Qualification Proposals
Project Location: NASA Ames Research Center, Moffett Field, CA 94035
General Information: NAICS: 236220, Commercial & Institutional Building Construction
Estimated Price Range: Between $46 and $56 million
The U.S. General Services Administration (GSA), in partnership with the National Aeronautics and Space Administration (NASA), is soliciting Phase-One qualification proposals for the design and construction of the Engineering and Mission Operations Facility (EMO), N278, located at NASA Ames Research Center in Moffett Field, California. The acquisition will utilize a two-phase design-build selection procedure. This solicitation constitutes Phase One – Request for Qualification Proposals.
NOTICE: Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at jamie.potter@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.
Questions: All questions shall be submitted in writing via email no later than Friday, September 11, 2026 at 2:00 PM (Pacific Time). Questions received after this cutoff may not receive a response.
Phase-One Submission Due Date/Time: Wednesday, October 7, 2026 at 11:00 AM (Pacific Time)
Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.
Stipend: The Government intends to provide a stipend of $100,000.00 to each unsuccessful Phase-Two offeror that submits a responsive proposal in accordance with the solicitation requirements. The stipend is intended to partially offset costs associated with the development of Phase-Two design concepts and technical proposals.
Interested offerors shall review the attached solicitation and all accompanying documents in their entirety for the complete requirements, evaluation criteria, submission instructions, terms, and conditions. The solicitation and any amendments thereto govern in the event of any inconsistency with this decription. Offerors are responsible for monitoring SAM.gov for amendments or other updates to the solicitation.
This requirement includes demolition of existing facilities and construction of a new multi-functional engineering and mission support facility intended to consolidate key operational functions into a centralized modern workspace environment. Demolition activities include removal of the existing Motor Pool Facility (Building N251), Machine Shop (Building N216), associated fuel infrastructure including two (2) existing Motor Pool Fuel pumps with underground fuel tanks and environmental closure of the fuel tanks, and related site improvements. The proposed EMO Facility N278 is anticipated to consist of a minimum of 30,292 gross square feet and will include office space, technical laboratories, meeting and collaboration areas, and mission support functions.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"1_Solicitation Phase-One NASA Ames Engineering and Mission Operations Facility N278.pdf"431669"file"".pdf""1""2026-08-28T16:20:42.43+00:00""2e6d3ca6d9f14dc2aa2afc9021f2a3e9""public""0""public""2a55f727113b4b90bf22a6d8135d2e05""0"31"0""2_ SF 1442 47PB5426R0014.pdf"1340600"file"".pdf""1""2026-08-28T16:20:42.43+00:00""00cfb515506a4f69bb69e31e71a98b9d""public""0""public""df40ae712ce0458795eb7b678f7d0095""0"28"0""3_Draft Agreement.docx"60190"file"".docx""1""2026-08-28T16:20:42.43+00:00""40435ffbe70448f69826d731b54e0070""public""0""public""31c8d509db0e4134aedf3580a9d1006b""0"25"0""4_CUI Building Information Request Form.pdf"93203"file"".pdf""1""2026-08-28T16:20:42.43+00:00""6039d83da3de4b75817b030043bff696""public""0""public""0a73df5e89124afa84680682c3535b63""0"22"0""5_Sample Proprietary Information Agreement.docx"8569"file"".docx""1""2026-08-28T16:20:42.43+00:00""c9675e94f618438c8d319cecaadf0276""public""0""public""881cb2f3ff534040b799dd3e32a5c999""0"19"0""6_NASA ARC N278_VOL 01_STATEMENT OF WORK_2026_07_23_R2_No_Alt.pdf"2089725"file"".pdf""1""2026-08-28T16:20:42.43+00:00""d4ed620a23904762851d5b282f03e554""private""0""controlled""300b070e96ba4ce2ae8817c7b55d36dc""1"15"0""6_NASA ARC N278_VOL 02_DIVISION 01 SPECS_2026-07-23_R2_No_Alt.pdf"2294310"file"".pdf""1""2026-08-28T16:20:42.43+00:00""8e8f1ccddfc14021b730a668e41550b6""private""0""controlled""b17124edf9bc4ce3b0f6459dfbb994ab""1"12"0""6_NASA ARC N278_VOL 03_BUILDING POR_2026_07_23.pdf"193524882"file"".pdf""1""2026-08-28T16:20:42.43+00:00""db859ad2fba649d589c4267d7c4068bb""private""0""controlled""cb8dcc1659354f48ac736d16f2da1d4e""1"6"0""7_Phase-One NASA Ames EMO Questions and Answers Log - RFI Log.pdf"56337"file"".pdf""1""2026-09-14T15:56:27.524+00:00""3dd01eba8a8f4c168d85360d855aeb94""public""0""public""c4a2096efcd04f7780db45a2824beba2""0"4"0""Solicitation Amendment 47PB5426R0014_0001.pdf"581741"file"".pdf""1""2026-09-14T15:56:27.524+00:00""2ca4dc7ad28e4a85926db1181fa88ba2""public""0""public""00ee111495fc4fd4a4f34a2a08e451a0""0"3"0""https://forms.gle/MM41jWqmCjPQnjtv6""NASA Ames EMO Design Build Phase-One Past Performance Questionnaire [Architect-Engineer]"0"link""1""2026-08-28T16:20:42.43+00:00""8895bba348f6434e9b4ac35b6715f9b5""public""0""NASA Ames EMO Design Build Phase-One Past Performance Questionnaire [Architect-Engineer]""public""28d8824026e04599aec0e52d571710b3""0"2"0""https://forms.gle/geKiMEJnQtN4wUmt5""NASA Ames EMO Design Build Phase-One Past Performance Questionnaire [GC]"0"link""1""2026-08-28T16:20:42.43+00:00""e15ff8abbbf0452e9e81dc50a386c94d""public""0""NASA Ames EMO Design Build Phase-One Past Performance Questionnaire [GC]""public""f71093dc784e4b5e9456adb0eae5cf12""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.