Proposal Requirement: The Contractor shall submit a technical proposal that fully addresses the requirements of the SOW. A separate price proposal will also be submitted with a detailed breakdown of labor, equipment, materials, and all other associated costs. Proposals are to be submitted electronically. The proposal submitted by the Vendor must be technically acceptable in a line by line review, conducted by the Government, as compared to the scope of work in the SOW. Additionally, the Vendor’s proposed price must be in line with the Government Estimate.
QUESTIONS: Companies who have questions pertaining to this solicitation notice or attached SOW shall Submit questions via email to amber.k.peeples.civ@army.mil and courtesy copy to david.l.gecewicz2.civ@army.mil no later than 26 August 2026 at 02:00PM (EST). Responses will be provided NLT 31 August 2026 04:00PM (EST). Late submissions will not be accepted.
The offeror's proposal shall be submitted electronically via email to amber.k.peeples.civ@army.mil,with a courtesy copy to david.l.gecewicz2.civ@army.mil. Proposals must be received no later than 04 September 2026 at 4:00 PM Eastern Standard Time (EST).
Basis for Award: This requirement is intended a a Lowest Price Technically Acceptable competitive award using simplified acquisition procedures. The proposal submitted by the Vendor must be technically acceptable in a line by line review, conducted by the Government, as compared to the work required within the associated SOW. Additionally, the successful Vendor’s proposed price must be the lowest of all technically acceptable proposals. This price shall also be determined both fair and reasonable by the Government.
The contractor shall provide all management, labor, materials, supervision, and equipment to deconstruct approximately 550 linear feet of the stone boundary wall in sections 17 and 18. Work includes carefully dismantling the existing stone wall and pilasters, removing, numbering, and mapping bluestone capstones for reuse, disassembling stonework, and reconstructing the wall using historical methods. The contractor must install erosion and sediment controls, tree protection, and safety fencing; excavate and install a continuous steel-reinforced concrete footing; reconstruct stonework with approved mortar; reset capstones with lead-coated copper joint flashing; clean stones and mortar; and restore the site with sod. The contractor must also provide a technical sheet and engineered design for wall reconstruction, submit a Documentation Plan, and provide weekly progress reports and a Final Report.
We post new wall-making opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"22060-5116""FORT BELVOIR""VA""USA""9410 JACKSON LOOP SUITE 101""Solicitation Amendment W91QV126RA0560002.pdf"3928492"file"".pdf""1""2026-08-20T22:04:35.234+00:00""5f90accd34774a43844f6d604c1827e8""public""0""public""ce33db2cf45744539038291cb954acf2""0"5"0""Solicitation Amendment - W91QV126RA0560001.pdf"8116399"file"".pdf""1""2026-08-18T15:03:55.143+00:00""1d9cbb7e0fd142269d7d1f80f7f577c5""public""0""public""20e24a1792844d8bb1d7f49cf89aa0ac""0"4"0""Solicitation Amendment W91QV126RA0560001 SF 30.pdf"4610934"file"".pdf""1""2026-08-18T15:03:55.143+00:00""13f365641c8645a0b525fe4ea4e70d82""public""0""public""8c9657bccbd44cac990d553b3976973d""0"3"0""SOW ANC Boundary Stone Wall Ph VI 260511 FINAL v2.docx"1292874"file"".docx""1""2026-08-13T22:53:35.504+00:00""b55c03f1bd3c482da3bfe93f1fd99f6c""public""0""public""3af08bb656e44107b0c605b012c0bb70""0"2"0""https://www.arlingtoncemetery.mil/""Arlington National Cemetery Homepage"0"link""1""2026-08-13T22:53:35.504+00:00""6b1712187bf54c81b32b46443c61e1c5""public""0""Arlington National Cemetery Homepage""public""011aee9825a34a88a27228d53314ee2e""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 71804da37eb840538f48827ecf77eb3a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.