MANTA DD POP 4/27/27-7/27/27
The contractor must provide a facility accessible from a navigable waterway with minimum 12-foot water depth and 60-foot height clearance where the vessel can arrive, lie afloat, and depart safely. Work items include hull plating ultrasonic side-scan testing, U/W body and freeboard preservation, tank cleaning and inspection (dirty oil, oily water, fuel service, grey water, sewage), main diesel engine W-5 maintenance and control system updates, main engine/reduction gear realignment, propulsion shaft and bearing renewal, propeller renewal, electrical power distribution thermographic inspection, fathometer transducer renewal, HVAC ventilation cleaning, sea water system maintenance, rudder assembly renewal, stern launch door removal/inspection/reinstallation, cathodic protection/zinc anode renewal, drydocking, temporary services, sea trial support, watertight closure repairs, window renewal, 24VDC distribution system upgrade, intrusion detection system replacement, and various foundation and structural modifications.
We post new goods & materials opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Attachment 3 - SOW Addendum MANTA.pdf"112661"file"".pdf""1""2026-11-02T20:04:32.994+00:00""3779d884bffb4117b5f7a933d3119b32""public""0""public""14be8819340b4a35b13038aabc23c57e""0"4"0""Attachment 2 - Specification MANTA.pdf"4554094"file"".pdf""1""2026-11-02T20:04:32.994+00:00""d530dc3bbc3f4f23b0da761f82de949d""public""0""public""9e1539b9e9124a5fb886c102a1d7d9d1""0"3"0""Attachment 1 - Schedule of Services USCGC MANTA.xls"93696"file"".xls""1""2026-11-02T20:04:32.994+00:00""d3f2cb8a4ca9467a974851e7cfade03e""public""0""public""6ee47e1965fb494b9b57a4a6ada81fb8""0"2"0""70ZU0127QPBPL0006_0_US (1).pdf"216000"file"".pdf""1""2026-11-02T20:04:32.994+00:00""b07157685a914f12a63eb5d56941e598""public""0""public""05919abefb56480da2dc83494a0d69e8""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 68da33451472405fb3470f2662865c2e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.