This is a follow-on Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build, design-bid-build, and Progressive Design Build (PDB) construction projects, which are specific to WPAFB, and applicable to individual Task Orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.).
Contractor efforts may also include design/build from concept to 100% design.
Work consists of a broad range of maintenance, repair, alteration and new construction on real property under individual task orders, including new construction of buildings and structures, alteration and repair of buildings, structures, roads, airfields, ground and roofs, specialty construction, utilities, and miscellaneous services including remediation and hazardous waste removal such as asbestos and lead paint, with contractor efforts that may include design/build from concept to 100% design.
We post new general contractors opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"45433-5344""WRIGHT PATTERSON AFB""OH""USA""CP 937 656 5842""1940 ALLBROOK DR BLDG 1 RM 109""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA860127R0004¬iceType=SolicitationNotice"0"link""1""2026-10-28T16:34:09.142+00:00""e01c44be11744f04930632b43a07ba7d""public""0""PIEE Solicitation Module Link for FA860127R0004""public""ddf544ba4d5f4c3f8c801e9f516d9ac4""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-28T16:34:09.142+00:00""13934323ca324307a91d494c236ecd24""public""0""Web Based Training for the PIEE Solicitation Module""public""63ef543be28d4aa1a2dfaa45584055a8""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-28T16:34:09.142+00:00""b90ac89d02624dc3a31628a204f77f68""public""0""Registration Instructions for the PIEE Solicitation Module""public""f445193f756d457eaf1d2fbcdd74da72""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-28T16:34:09.142+00:00""13cc033cd1d34b0591f0b647621b30c8""public""0""Department of Defense Procurement Toolbox""public""f846e5c68b7d466aad02156ae356d729""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 547e8b35807b488c88957346504723b0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.