The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.
UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local. Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA.
RFI's due out is extended to being due by the end of the day 27 Sep 2026, and Bid Openning is going to be moved to 15 Oct 2026 at 0900 local. Ammendment to the Soliciation forthcoming to show those changes.
See Amendment W50S9E26BA0020001 in attachments for amended soliciation and W50S9E26BA0020001 SF30 for the changes.
The contractor shall supply all supervision, labor, equipment, and materials to construct a complete and usable organizational parking area with connecting roads, including all curbing, retaining walls, lighting, landscaping, identified roadways and covered parking installation as found in the SOW ETRD 249361 Construct Parking and Roads, dated 28 JULY 2026 and all applicable SPECs and Drawings. The work is located at building 140 on Camp Murray, WA. The project includes base item CLIN 0001: Construct GOV Parking and Roads, and may include option items for additional work. The contractor must also perform site investigations and hold design charrettes to adequately capture the customers' requirements for the space.
We post new asphalt opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"98430-5035""CAMP MURRAY""WA""USA""KO FOR WAANG DO NOT DELETE""101 41ST DIVISION WAY""Parking and Roadway site visit signin.pdf"409635"file"".pdf""1""2026-09-18T17:00:09.979+00:00""daa00f1f61ff4c2684368e37f1d6598a""public""0""public""878a7fd67edd4be89df24eec1a1462b0""0"10"0""Solicitation Amendment W50S9E26BA0020001.pdf"6639523"file"".pdf""1""2026-09-18T16:09:17.627+00:00""e313d1d0428c4d6ba21be94049cf5cc8""public""0""public""43aa8c64bea040ac984a12719bfb3ff3""0"9"0""Solicitation Amendment W50S9E26BA0020001 SF 30.pdf"4041841"file"".pdf""1""2026-09-18T16:09:17.627+00:00""59f056d7e3594a62991041ae24210f38""public""0""public""fd7c87c9e4564012a05ae2fbb67f34cf""0"8"0""W50S9E26BA002 Solicitation.pdf"28108272"file"".pdf""1""2026-09-10T14:03:26.605+00:00""db0f31b33e054e598bce1f0c7e8eddc2""public""0""public""c4caca2e8b9349d1bc15ab14e52508f8""0"7"0""Attachment 3 - Camp Murray ASOG Site Improvements - Type B-3 - Specifications.pdf"27398841"file"".pdf""1""2026-09-10T14:03:26.605+00:00""5405158e8ecf447bac2b6c6ed6e2802b""public""0""public""e97fdf1914d14c18b8ebf81bc3103f3e""0"6"0""Attachment 4 - Construct Infantry Dr to B116 Drawings - 30-July-2026.pdf"21908380"file"".pdf""1""2026-09-10T14:03:26.605+00:00""c60803ce9c224c72beb4257f18e489a6""public""0""public""c2a92a8081494890814c0d97794df876""0"5"0""Attachment 2 - GOV Parking and Armor Drive Drawings - 30-July-2026.pdf"19117401"file"".pdf""1""2026-09-10T14:03:26.605+00:00""73c82b30c77048cba57585c73b10a913""public""0""public""cd30e550c9944b4ba91299dd7433eb41""0"4"0""Attachment 5 - 05c Specifications.pdf"2116487"file"".pdf""1""2026-09-10T14:03:26.605+00:00""2d92486097ef4157acfc82778b392559""public""0""public""24df64405e3d447b9fe45f25b9c62be0""0"3"0""Attachment 1 - 05 WA ANG Construction Solicitation SOW Construct Parking and Road.pdf"488546"file"".pdf""1""2026-09-10T14:03:26.605+00:00""ec8699d18827414eb4224c78ceb2090a""public""0""public""c2246ef5ecff41fc914fb0d3e5613e03""0"2"0""Attachment 6 - 07 Example Bid Report Construct Parking and Roadway.xlsx"181950"file"".xlsx""1""2026-09-10T14:03:26.605+00:00""3a02cef5b80c4dde94209956895dbb31""public""0""public""8c55973c02dd4a099dc5099f83324ea5""0"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S9E26BA002¬iceType=SolicitationNotice"0"link""1""2026-08-27T20:49:19.409+00:00""4fb3f5da2d544542981b84d4bb7e3e47""public""0""PIEE Solicitation Module Link for W50S9E26BA002""public""701d428305ff40d9a1173448800eece2""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-08-27T20:49:19.409+00:00""be7fd2b8f8534a6c890813508b46cb7f""public""0""Web Based Training for the PIEE Solicitation Module""public""7bb189ee7bd949eb92c52bee1f0d681a""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-08-27T20:49:19.409+00:00""478119a0800a4fa59a6388e4b6068fac""public""0""Registration Instructions for the PIEE Solicitation Module""public""0bbe05c4d3b9434f8fd2a3fbebc1205d""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-08-27T20:49:19.409+00:00""a47a3f1592a441ef892e031f01aa14ef""public""0""Department of Defense Procurement Toolbox""public""cebcf56964bb4bdeb8daaf2c07c6bacd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 547c9d28f3c74d0cb8cf6e34ab286e3c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.