Project No. ID FLAP ADA 2019(1), Western Heritage Byway – Swan Falls Road
See attachments for Request for Proposal (RFP), plans, and phyiscal data files.
THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELYFOR THE FOLLOWING CONTRACTS AND CONTRACTORS:
*Contract No. 69056725D000002
Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION
Address: 217 College Ave. STE 5, Orofino, ID 83544
Phone: 208-476-3617
*Contract No. 69056725D000003
Contractor: GRANITE CONSTRUCTION
Address: 585 W Beach St., Watsonville, CA 95076
Phone: 360-606-1335
*Contract No. 69056725D000004
Contractor: HAMILTON CONSTRUCTION
Address: 2213 South F Street, Springfield, OR 97477
Phone: 541-746-2426
*Contract No. 69056725D000005
Contractor: M.A. DEATLEY CONSTRUCTION, INC.
Address: 829 Evans Road, Clarkston, WA 99403
Phone: 509-751-1580
*Contract No. 69056725D000006
Contractor: MJ HUGHES CONSTRUCTION, INC.
Address: 11510 NE 87TH AVE, Vancouver, WA 98662
Phone: 360-314-2024
*Contract No. 69056725D000007
Contractor: THOMPSON CONTRACTING, INC
Address: 502 Gruber Rd., Libby, MT 59923
Phone: 406-293-5392
THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE
PRIME CONTRACTORS.
This information is also available on our website:
Idaho, Montana and Surrounding Areas MATOC:https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-andsurrounding-areas-idiq-matoc
The work includes four bid schedules (A, B, C, D) covering roadway excavation, rock excavation, placed riprap, roadway aggregate, asphalt concrete pavement, tack coat, asphalt pavement milling, crack cleaning and sealing, minor concrete pavement, pipe culverts (12-inch, 18-inch, 24-inch), end sections, cleaning culvert in place, concrete wheelstops, concrete sidewalk, flowable backfill, cattle guards, remove and reset fence, dump truck and backhoe loader rental, general labor, special labor for archeological services, providing and placing topsoil, turf establishment, sign system, object markers, rumble strips, pavement markings (solid white, solid yellow, broken yellow, accessibility symbol), temporary traffic control (barricades, drums, portable changeable message signs, pavement markings, construction signs, flaggers, pilot cars, traffic control supervisor), and Dedication Point improvements including two Pilot Rock APT Series picnic tables, one CXT Double Cascadian Vault Restroom with Chase, and one Poligon Gable Roof rectangle REK shade structure. The project also includes mobilization, construction survey and staking, contractor quality control, contractor testing, construction schedule, soil erosion control, watering for dust control, clearing and grubbing, removal of cattle guards, gates, restroom facilities, signs, vaults, and fence, sawcutting pavement, ditch excavation, and remove and reset boulders.
We post new asphalt opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""RFP_69056726R000010_ID FLAP ADA 2019(1)_Final.pdf"4747909"file"".pdf""1""2026-09-17T16:44:31.764+00:00""7dff394785754181a6ac012cafc40c0f""public""0""public""9e311f5a518a4840b35dc7b0139cfc61""0"6"0""ida-ada2019-1_plans_signed.pdf"43052921"file"".pdf""1""2026-09-17T16:44:31.764+00:00""ee233534b1a4452e9308ba53a9ff9409""public""0""public""6706dfb33950420c8baf91aeaee73e7b""0"5"0""Physical Data.zip"69738807"file"".zip""1""2026-09-17T16:44:31.764+00:00""1a69035f5c9248089d0e4659b81060fa""public""0""public""e40a25cbf95b4117883aeb417772ea8c""0"4"0""Brand Name Justification_ID FLAP ADA 2019(1).pdf"358660"file"".pdf""1""2026-09-17T16:44:31.764+00:00""4345c3e174434dcbb226ec83bd0ac4e8""public""0""public""f4c3744ac2424658a7fff353a4a2f788""0"3"0""https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc""Link to MATOC information"0"link""1""2026-09-17T16:44:31.764+00:00""b30c453fb82647119de938cd4c791cfd""public""0""Link to MATOC information""public""4a19fbd3d9d4468b821def537caabcf9""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6a75b9efe63643c384422a27f8f853e9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.