AMENDMENT 0001 See SF 30 above for details.
The contractor shall provide all tools, labor, materials, equipment, supervision, professional services, and expertise required to perform general construction, alterations, site work, select demolition, hauling, disposal, electrical work, and relocation of existing utilities to correct fire life safety issues at various buildings both on and off campus. The work includes but is not limited to new hand rails, new fire egress stairs, new exterior stair coverings, guard rails, stair wells, sidewalks, stair well coverings, doors, fire extinguishers, fire alarm systems, sprinkler systems, and wall modifications. The contractor must manage and perform all work including permitting, demolition, construction, construction management, submittals, equipment, scheduling, inspection and testing, environmental protection, recording of as-built drawings, and project closeout. The work will be performed at an occupied healthcare facility in operation 24 hours a day, requiring coordination to minimize interference with medical center operations.
We post new life safety opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""36C24626R0078 0001.docx"17772"file"".docx""1""2026-08-26T18:00:57.914+00:00""28737cce92164376bf79f3a9d65386b6""public""0""public""1c9fc7b362584d3eba6b9b6296b71e1f""0"8"0""ATTACHMENT F - PAST PERFORMANCE QUESTIONAIRE.docx"21318"file"".docx""1""2026-08-21T23:30:42.075+00:00""2678d9ed0d6e4b8794858af5d2a57dd4""public""0""public""a722fa8196cf4f4db3a15907144e679b""0"7"0""ATTACHMENT E - VA Bldgs Map - SITE VISIT MEET POINT - BLDG. 27.pdf"909711"file"".pdf""1""2026-08-21T23:30:42.075+00:00""468f938605814edda3374f618c8fe0fb""public""0""public""88ae5a0b344f4538be1a63ef96cee5ea""0"6"0""ATTACHMENT D WAGE DETERMINATION Last Revised Date 05-18-2026.pdf"40174"file"".pdf""1""2026-08-21T23:30:42.075+00:00""37f3a0b67ecc488eb71a0d4273f02f21""public""0""public""0f0ed80c5d934259b3a738289ea9c36d""0"5"0""ATTACHMENT C - PROPOSAL ITEMS COST BREAKDOWN.xlsx"24002"file"".xlsx""1""2026-08-21T23:30:42.075+00:00""15e2050bf3b441bc8628e7e9a5f6739d""public""0""public""d7df61d473d140ab924d05ece2fc53b7""0"4"0""ATTACHMENT B DRAWINGS.pdf"61994803"file"".pdf""1""2026-08-21T23:30:42.075+00:00""1454a12fe6044b57bbc2b969bedf6129""public""0""public""961c7cd8475c4804b1ae3024867b2b2c""0"3"0""ATTACHMENT A SPECIFICATIONS_rev.pdf"3846527"file"".pdf""1""2026-08-21T23:30:42.075+00:00""7488209f26ff4ea39723a7eba1da3abb""public""0""public""0188a1566436421baad35449c247f4fc""0"2"0""36C24626R0078_1.docx"129138"file"".docx""1""2026-08-21T23:30:42.075+00:00""58e11a5aaa8c4e4086173b56487bdbc4""public""0""public""ca72aedb3e494604b48d5936c39facdb""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 52bf83b9d13e449496bbfd963b7e0f0a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.