NM-SW NATIVE ARC - Lochinvar Heat Exchanger Replacement
The Contractor must shut down the boiler, drain fluid, disassemble and remove the digital assembly, gas train, electrical controls, and inducer motor, cut inlet/outlet water and exhaust piping, and replace the heat exchanger with a new OEM unit. The work includes replacing the burner refractory, gaskets, safety gas switch, condensate neutralizer media, reconnecting plumbing, testing for leaks, verifying the system works, and shipping the old core to Lochinvar for warranty evaluation.
We post new equipment maintenance & rental opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22041""Falls Church""VA""USA""FWS, SAT Team 2""5275 Leesburg Pike""Sol_140FS226Q0199.pdf"381572"file"".pdf""1""2026-09-10T22:11:49.313+00:00""78d86e7a8caa408fba0665bf90ecec2c""public""0""public""ccbaa78b66944ceaaead1d1c576e75e7""0"4"0""A04_-_Statement_of_Work_-_Heat_Exchanger_Replacement.pdf"161364"file"".pdf""1""2026-09-10T22:11:49.313+00:00""d355ac1caba84e2bbd958e5468d1fe10""public""0""public""34d54b1cbe484e84bb3a3d73ce747863""0"3"0""A16_-_Brand_Name_Justification_44057234_Executed.pdf"2132014"file"".pdf""1""2026-09-10T22:11:49.313+00:00""2af6edf497b44440823c5b149b6e796b""public""0""public""9ab5acd65e424778b88101adb957921e""0"2"0""B03_-_Service_Contract_Act_WD___2015-5455_-_Rev_32.pdf"4301619"file"".pdf""1""2026-09-10T22:11:49.313+00:00""af22d6d8578d49ca86eac9693ee1c058""public""0""public""47ebec3c442242cf95fa358f2d5eeaee""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 51313b36e8174292ba24d9c9c3b9a7a9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.