This project consists of removing existing electric single packaged vertical unit (SPVU) and legally dispose. Provide and install similar new electric 4-ton SPVU (minimum 11 EER/3.3 COP) with defrost kit [Bard W48HFA15 and Bard HVAC 8620-223 Defrost Board Replacement Kit or approved equals], including all electrical (with any necessary connections or upgrades to the panel), structural or ducting modifications, and non-proprietary, programmable control(s). Perform startup testing and adjustments. Provide O&M manual(s), including as-built drawings. Obtain all appropriate permits necessary to complete the project. Clean all existing air ductwork (interior surfaces) and registers with HEPA filtrated vacuum device(s) and legally dispose of waste. Disconnect flexible ducting for cleaning and inspection, then reconnect properly and inspect when the system is running.
Project Location: Three Rivers Ranger Station (Bldg #2017) 255 W 11th Ave, Kettle Falls, WA 99141
This project is being solicited in accordance with FAR 12.201-1(c)(2). The Government will issue a request for quotes directly from local HVAC contractors, and will not issue a solicitation on SAM.gov. If your company is interested in future small HVAC projects in eastern Washington, then ensure that you have an active SAM.gov account and provide your company name and Unique Entity Identifier (UEI Number) to eric.oldenkamp@usda.gov.
The work involves removing an existing electric single packaged vertical unit (SPVU) and legally disposing of it, then providing and installing a similar new electric 4-ton SPVU (minimum 11 EER/3.3 COP) with a defrost kit such as the Bard W48HFA15 and Bard HVAC 8620-223 Defrost Board Replacement Kit or approved equals. This includes all necessary electrical connections or panel upgrades, structural or ducting modifications, and non-proprietary, programmable controls. The contractor must perform startup testing and adjustments, provide O&M manuals including as-built drawings, and obtain all appropriate permits. Existing air ductwork and registers must be cleaned with HEPA filtrated vacuum devices and waste legally disposed of, and flexible ducting must be disconnected for cleaning and inspection, then reconnected and inspected while the system is running.
We post new hvac opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""97601""KLAMATH FALLS""OR""USA""FREMONT WINEMA NF KLAMATH FALLS""2819 DAHLIA STREET"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 4d0b0356903b4c369e4af47f4fccc85f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.