Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Upgrade
Work includes end-to-end tests for all optical fibers with visual representation of the fiber network, furnishing and installing fiber backbone upgrade with trenching, conduits, fibers, patch panels, vaults and accessories between Administration Building Server Room, Emergency Generator Building, Sheriff's Building Communications Room, Powerplant Server Room, Pumping Plant and Dam, furnishing and installing 14 security cameras with cables connected to the existing EACSS, installing patch panels in five locations, providing cable, raceway and supports, transferring existing EACSS to the upgraded backbone, miscellaneous electrical and control work, and removing unused patch panels, accessories and fiber backbone cables, including disturbing Asbestos Containing Materials.
We post new electrical opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"C02__01__Synopsis_1.pdf"127305"file"".pdf""1""2026-10-30T20:56:22.809+00:00""0752ce85cd714eebab72a746e41afe7e""public""0""public""6604d001e666449cbc8cf2e638296651""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4abf8fbfbfa24ba0b8e235d3d4077c5e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.