The Mann-Grandstaff VA Medical Center, Spokane, WA requires labor, materials, and equipment for the repair of sanitary waste piping in Building 1 (Main Hospital) for Project 668-24-108. Please review attached Solication # 36C26027R0021 for full details and proposal submission requirements.
Amendment 0001 - Posting of revised Site Vist Map
Amendment 0002 - Posting of revised Attachment 6 - Limitations on Subcontracting.
This project repairs and replaces the vertical piping riser serving Building 1 drinking fountain drains from basement through the ninth floor, with access through existing panels, removal of drinking fountains and water coolers, and wall penetrations for six new ADA/ABAAS compliant semi-recessed refrigerated bottle-fill stations, including asbestos pipe wrap and friable ACM remediation, lead paint and glazed block remediation, replacement of soil piping fittings and branches, new electrical circuits from the 9th floor, wall finish restoration, supervision, startup, training, O&M documentation and one-year warranty.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""98662""VANCOUVER""WA""USA""5115NE 82ND AVE""SUITE 102""Amendment 36C26027R0021 0002.docx"120034"file"".docx""1""2026-11-12T21:10:37.96+00:00""af33dda0e4e64dada8cb6e5ee8da9a0a""public""0""public""151cd6d1224d46d587ebf28f00d08002""0"92"0""Attachment 6 - 668-24-108 Limitations on Subcontracting Certificate of Compliance.pdf"117575"file"".pdf""1""2026-11-12T21:10:37.96+00:00""5516759c4fca4e959a2c4e8da0972e37""public""0""public""d620b6d2274240469a51cb9ed39c260d""0"91"0""Amendment 36C26027R0021 0001.docx"119043"file"".docx""1""2026-11-04T19:55:17.243+00:00""3a891dac2e68431899da1d1cf2091b68""public""0""public""9b289af64d674725af6e8499d88b4142""0"90"0""Solicitation 36C26027R0021.docx"296677"file"".docx""1""2026-11-02T20:43:38.265+00:00""8fda0463d75f4779b174ed446d549b59""public""0""public""db5916fb5e8d435595dce9838f6ab4fc""0"89"0""Attachment 1 - 668-24-108 Construction SOW R2.docx"46605"file"".docx""1""2026-11-02T20:43:38.265+00:00""df83f317b1124422ac1a711b613de72c""public""0""public""a5490b1ee18b4de193f489320e100a64""0"86"0""Attachment 2.1 668-24-108 Drawings.pdf"4133393"file"".pdf""1""2026-11-02T20:43:38.265+00:00""159c92ff1bfa4149816e4dc907921297""public""0""public""bfdb381ef9f54827832c45c34f285a8b""0"80"0""Attachment 2.2 668-24-108 Drawings.pdf"22097907"file"".pdf""1""2026-11-02T20:43:38.265+00:00""34af3621862b44218278b7f83aeb5708""public""0""public""df06cf91ffba412b88558fafdc9fffbd""0"78"0""Attachment 2.3 668-24-108 Drawings.pdf"24901092"file"".pdf""1""2026-11-02T20:43:38.265+00:00""d3c59622ebc1487ba3e212faf33ea67f""public""0""public""8b26375a22b14124bd0b315e002abf0c""0"74"0""Attachment 3 668-24-108 Bid Set Specifications.pdf"6411086"file"".pdf""1""2026-11-02T20:43:38.265+00:00""f633ce817ea744eeac9fb4bc50368d18""public""0""public""19f48a4d056a47abb89339cdde64cf29""0"68"0""Attachment 4 668-24-108 PCRA.pdf"1206662"file"".pdf""1""2026-11-02T20:43:38.265+00:00""821ea57bc4f14d17877eeecad0bd2cb2""public""0""public""762816a922ec425394ee19117c73a1b6""0"66"0""Attachment 5 668-24-108 DESIGN NARRATIVE.pdf"505461"file"".pdf""1""2026-11-02T20:43:38.265+00:00""9ab4b38ee7dc4f7686571c406dce859e""public""0""public""50b81e2abfe2407db80ca59111ab2adc""0"64"0""Attachment 6 - 668-24-108 - Limitations on Subcontracting-Construction.pdf"182012"file"".pdf""1""2026-11-02T20:43:38.265+00:00""febf95a78ff049bd86e9d80faedcd198""public""0""public""635dcf7829144660b42855a0c47a0e68""0"62"0""Attachment 7 - 668-24-108 - Contractor Rules of Behavior.pdf"183302"file"".pdf""1""2026-11-02T20:43:38.265+00:00""ac3f81057a9e4d40a7868c3adf6e5a99""public""0""public""72e30003aa394e528e601484df6f0414""0"60"0""Attachment 8 - 668-24-108 - Past Performance Questionnaire.docx"124791"file"".docx""1""2026-11-02T20:43:38.265+00:00""9e5a9633c5744d28818af20676cc1af9""public""0""public""0b4cdbfff9e144fd9fa95fb143432fe8""0"50"0""Attachment 9 668-24-108 Wage Determination.pdf"42486"file"".pdf""1""2026-11-02T20:43:38.265+00:00""51bbc3dde18548ab94821dfaf8e45249""public""0""public""11f6acaea934425ea864f2d25aea8329""0"48"0""Attachment 10 - 668-24-108 Site Visit Area Map (Revised).pdf"176233"file"".pdf""1""2026-11-04T19:55:17.243+00:00""8a20592f14cb4c8d86aec518cd039fb6""public""0""public""795b93a13b2940d7a3a22cd98ff25961""0"45"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 448422d8b2aa4a7fb33273befc7d52ef), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.