Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
The contractor provides supervision, expertise, labor, materials and equipment to replace ECUs on all three EPSS generators with OEM upfit kits including onboard controllers, custom-fabricated wiring harnesses, pulse-controlled fuel injectors, Marathon DVR 2400 voltage regulators and associated controls, coordinate RussElectric/Siemens switchgear integration, phase work on engines 1 and 3 before engine 2, hire an independent commissioning agent, perform no-load, temporary resistive/reactive load-bank and integrated hospital load testing for NFPA 110 acceptance, and provide training, O&M manuals, as-builts and commissioning reports.
We post new electrical opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Amend 0001.pdf"1465967"file"".pdf""1""2026-11-16T18:10:28.349+00:00""f6b366f0c20c41e7821c1b2bfbe01537""public""0""public""36af74a0f6f34db9a0fab072df587313""0"6"0""RFP 270700.pdf"206189"file"".pdf""1""2026-11-13T17:43:57.89+00:00""a431333188a04a5ebfc52cc3c07bbcc2""public""0""public""0b5f2924c8414b5f925eed36bafb4cca""0"5"0""NH100 REPLACE ENGINE CONTROL UNITS ON 3 GENERATORS revised.pdf"117215"file"".pdf""1""2026-11-13T17:43:57.89+00:00""ca20e420f4f94ef1ac4bf9305b7f06c3""public""0""public""41884e52df3148798f7c236552d6f38c""0"4"0""Combined DIV 01 specs small projects.pdf"568081"file"".pdf""1""2026-11-13T17:43:57.89+00:00""25bdb014c25e4012909df21a6619ee37""public""0""public""7b3038669ce54d0cad54d213583ecc6c""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3d1047a79fca4b6cb338168a8913676c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.