The Office of Construction and Facilities Management (CFM) has a need to improve seismic conditions at the Marion VAMC in Illinois. The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete construction of the new boiler plant (Building 14) as well as the demolition and removal of the existing plant, both of which reside on the grounds of the VA Medical Center (VAMC) in Marion, IL. The contractor shall refer to the Project #657-507, Correct Seismic Deficiencies B14 plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.
The purpose of this update is to add directions for the 20 OCT 2026 site visit. See attached strip map word doc
The contractor shall provide all planning, labor, materials, equipment, supervision and expertise for complete construction of the new boiler plant (Building 14) and demolition and removal of the existing plant. Work includes site preparation with approximately 0.7 acres of cut and fill earthwork, parking lot and security fencing construction, utility modifications (water, electrical, telecommunications, sanitary sewer, storm sewer, natural gas, steam), roadway realignment and steam tunnel modification. The new building will be supported on augercast pile and grade beam foundations with structural steel braced frame system and reinforced masonry walls. Building systems include three 250 HP gas-fired firetube boilers with fuel oil backup, climate control systems, fuel oil polishing systems, electrical systems including diesel generator, plumbing systems including water tower pumping and monitoring, and fire protection systems with sprinklers and alarms. Work includes startup and commissioning of all systems, cutover of utilities from existing to new plant, and demolition of the existing plant structure originally built in 1940 with subsequent 1980s seismic retrofit. Work must be completed within 24 months (730 calendar days) from Notice to Proceed, performed during normal working hours 7:00 am to 4:30 pm Monday-Friday unless approved in writing, and coordinated with ongoing VA Medical Center operations.
We post new hvac opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20420""WASHINGTON""DC""USA""810 VERMONT AVENUE NW""Instructions for 20 OCT 2026 B14 Site Visit.docx"115506"file"".docx""1""2026-10-19T20:14:33.712+00:00""0f27039d03a54f8c8f6310fc061224df""public""0""public""1f711c85d8dc4ebb89095b26b41893e9""0"9"0""S02 - 36C10F26R0085_1.pdf"753251"file"".pdf""1""2026-10-07T19:26:15.156+00:00""5f77688c3366445987eefea948875214""public""0""public""bddf51601764488f815316407f820b08""0"8"0""S02 - 657-507_VA Marion Seism Defics_Bid Drawings 09-30-2026.pdf"85789848"file"".pdf""1""2026-10-07T19:26:15.156+00:00""408900b2cf4143428d685a403d5c77e7""public""0""public""84aa7dc255ca41d3bcc8b71b7e1cde01""0"7"0""S02 - 657-507_VA Marion SeisDefic_Final Bid Specs 9-1-2026.pdf"12978134"file"".pdf""1""2026-10-07T19:26:15.156+00:00""0bb595571424496d874e37bd94f176e4""public""0""public""7583857631f944599ffae8966d5686cc""0"6"0""657-507_Marrion_CorrectSeisDef - Appendix-HAZMAT 1.pdf"14084094"file"".pdf""1""2026-10-07T19:26:15.156+00:00""716421c957c148748ed01638c4538024""public""0""public""1a76a630389f428a9f8c7633c056b7f1""0"5"0""657-507_Marion_CorrectSeisDef - Appendix - SHPO MOA 1.pdf"8456216"file"".pdf""1""2026-10-07T19:26:15.156+00:00""cac475059b2b40c292ed5ee4ae58d024""public""0""public""ac1cc202f4c3408fa9ceee736617557b""0"4"0""657-507_Marion_CorrectSeisDef - Appendix - Geotech Report 1.pdf"2140409"file"".pdf""1""2026-10-07T19:26:15.156+00:00""7b58a41daef841b694820078fea447cc""public""0""public""2ac35ffa3b5d480eb699950b587b6045""0"3"0""657-507_Marion_CorrectSeisDef - Appendix - Geotech Report GMHA Seismic Report 1.pdf"2222553"file"".pdf""1""2026-10-07T19:26:15.156+00:00""bb124f10205c4e94bde750a6f3bfdc1c""public""0""public""9200e893797741a193772a4585033f96""0"2"0""657-507_Marion_CorrectSeisDef - Appendix - Geologic Hazards Report 1.pdf"1116509"file"".pdf""1""2026-10-07T19:26:15.156+00:00""270d641f668843dab09bd671e842f622""public""0""public""96542a5cf1384b5591896bd8c5ba43cd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2e61616baedf466f983cc62bccd19c3c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.