Amendment 36C25526R0166_1 0002
Purpose:
a) To incorporate Governents response to Pre-proposal RFIs,
b) Change NAICS code from 236220 to 238220 & Size standard from $45.0M to 19.0M.
c) change proposal due date from 10-16-2026 to 11-03-2026.
d) Final RFIs for Government response are due 10-20-2026 by 2PM CST.
e) Replace design manual with plumbing manual.
f) Incorporate revised specifications.
g) Update Wage Determination for STL MO
Due to the volume of RFIs recieved, a copy of an updated solicitation has been uploaded to address non-technocal RFIs. Sections in bold red text indicate changes in response to RFIs that mainly address non-technical RFIs. All responses to technical RFIs can be found on the attachment lableld response to pre-proposal RFIs.
**Notice 1 & 2 do not require acknowledgement. Only amendments 1, 2 and any subsequent amendments that are issued require acknowledgment on proposal submissions. **
Please see attachement section*
Amendment 36C25526R0166_1 0001
Purpose: The site-visit sign-in sheet and RFI questions are incorporated. Please see attachement section for sign in sheet and RFIs.
**Notice 2: 36C25526R0166_1 **
Purpose: The design manual attached also serves as the specifications for this solicitation. The solicitation can be accessed in the attachment section.
**Notice :1 36C25526R0166_1 **
Purpose: VA Notice of Limitations on Subcontracting Attachment applies to this solicitation. Please see attachments section.
Please reponsed by the specified date and time for consideration of contrat award. The solicitation is included in the attachments section of this announcement.
Install four new 45-gallon domestic hot water generators with steam PRV stations, piping to existing shutoff valves, controls and BAS/ECC integration, recirculation pumps, mixing valves and expansion tanks, commission the new units, then remove four old generators with ancillary equipment, provide as-builts, O&M manuals, training, and one year of guarantee period inspection and maintenance service.
We post new hvac opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""66048""LEAVENWORTH""KS""USA""VA MEDICAL CENTER""4101 SOUTH 4TH STREET""WAGE DETERMINATION MO20260089 5-18-26.pdf"101593"file"".pdf""1""2026-10-15T10:59:29.549+00:00""ac2afbab870447d29610644c5dfbfa0a""public""0""public""d3f45e2178fe49b58e01151ef0d0fa7b""0"13"0""PRE-PROPOSAL RFI RESONSES 657-27-107.pdf"411966"file"".pdf""1""2026-10-15T10:59:29.549+00:00""f15dd53a62af48fe9ccd5a97a3919019""public""0""public""c713b8bc6af6495a88ae5da569bd9d9b""0"12"0""PLUMBING PG 18 - 10 DESIGN MANUAL 657-27-107.pdf"2900657"file"".pdf""1""2026-10-15T10:59:29.549+00:00""e604abfd6f2c4d0e8e02570a7cf40d4e""public""0""public""12a69adbecfe450f9ff904ab77913290""0"11"0""REVISED SPECIFICATIONS 657-27-107.pdf"125051"file"".pdf""1""2026-10-15T10:59:29.549+00:00""258923ca85bb4cab8d5f3c325228c10f""public""0""public""2b8bd2928ce14359914654950abc3f54""0"10"0""UPDATED SOLICITATION 36C25526R0166_1.pdf"965898"file"".pdf""1""2026-10-15T10:59:29.549+00:00""bf18a8c79a4c4cbbae8382f231ffdd5b""public""0""public""0ee367eccff045a1b4bbe6d39ff16d69""0"9"0""PRE-PROPOSAL RFIs 36C25526R0166.pdf"103080"file"".pdf""1""2026-09-28T17:27:13.924+00:00""73ffdb4638e147b6a2459d714761597e""public""0""public""92dbfc9b077841ff967c19f870bb2e7c""0"8"0""PRE-PROPOSAL SITE VISIT SIGN IN SHEET 657-27-107.pdf"93696"file"".pdf""1""2026-09-28T17:27:13.924+00:00""ab464accada643c88bea934ed4ab44f4""public""0""public""74c182a6f75f4c4fa17a3bb1337f5656""0"7"0""VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING.pdf"149385"file"".pdf""1""2026-09-17T20:33:20.101+00:00""59481366b2d74fe7a44c1306b6c332a2""public""0""public""910684d13fb94c8e8cdfe9a87c25fc4d""0"5"0""ATTACHMENT DESIGN MANUAL 36C25526R0166_1.pdf"1513120"file"".pdf""1""2026-09-16T21:02:10.079+00:00""97aa943eedfa47d1bfeef703b96e803d""public""0""public""56fcd7e3398246279fe49f0fd9a5b9c4""0"4"0""ATTACHMENT DRAWINGS 36C25526R0166_1.pdf"3615683"file"".pdf""1""2026-09-16T21:02:10.079+00:00""f47b87d3d17143da9f1272b1d0000af3""public""0""public""2313414f735a4de2a73cb1a43d30b681""0"3"0""ATTACHMENT SPECIFICATIONS 36C25526R0166_1.pdf"1513120"file"".pdf""1""2026-09-16T21:02:10.079+00:00""89c680612ebf4934adc93d062c23318d""public""0""public""f81e5434c72347ed903cb9f64544c07c""0"2"0""SOLICITATION 36C25526R0166_1.pdf"930147"file"".pdf""1""2026-09-16T21:02:10.079+00:00""b36b458042d84111954859c20f54838e""public""0""public""302c267212b44bfaa3d1fe7e9a8e8a7b""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 81ade0bde49744928bea72114a2f8ca1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.