This amendment is to answer RFI questions. Proposal due date remains the same. It will be Thursday October 15, 2026 at 10AM EST,
Site Map is attached as well
The contractor shall provide all materials and labor to replace approximately 12,180 square feet of cracked or damaged concrete sidewalks at locations including Bldg 143 and Bldg 57 (approx 3600 SF), Bldg 53 & 54 (approx 2700 SF), 1st Circle including Bldgs 1,2,3,4,5,6,7,8,9 (approx 2880 SF), and Knollcroft Road (approx 3000 SF). Work includes removing existing concrete using demo saw, jack hammers and concrete breakers; removing debris; installing 2x6 premium grade lumber forms; using 3/4 inch gravel fill at 4 inches deep; installing #6 wire mesh reinforcement; pouring 4000 PSI concrete at 5 inches thick; installing 20 ADA warning pads (wet set, 2x4, red); curing concrete overnight; backfilling with top soil and grass seed; and removing dumpster and safety fencing. The contractor must also install security fencing around the construction site, provide daily progress reports and pictures to the Contracting Officer's Representative, and provide all submittals for material no later than 10 days from receiving the notice to proceed.
We post new asphalt opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""RFI Questions for Solicitation 36C24226R0131.pdf"100163"file"".pdf""1""2026-10-08T15:27:16.106+00:00""81b96c34028a41d5b29b93c6693462eb""public""0""public""e17419715f3041eaa3814873b353fdfd""0"7"0""Site Map.pdf"1946283"file"".pdf""1""2026-10-08T15:27:16.106+00:00""889c34a80ecb4c3189ce215312b81165""public""0""public""e2bdfe03c77f4236bdade8479bb8388d""0"6"0""36C24226R0131 0001.docx"17700"file"".docx""1""2026-10-08T15:27:16.106+00:00""ae39ed9548ba4755b067b864f4887a54""public""0""public""1b68629b55f449eeba5e33920a5fc9bc""0"5"0""852.219-75 Limitation on Subcontracting.pdf"59826"file"".pdf""1""2026-09-30T12:55:13.956+00:00""fe4297d690e34ae0b6469f7483d91390""public""0""public""a5ed72a78577409ea81d113f1dfcb2f1""0"4"0""Buy American Certificate.pdf"54676"file"".pdf""1""2026-09-30T12:55:13.956+00:00""0d2f731f259d421cb409e7ef051601fd""public""0""public""6f101bfbeb2e49c7b98a89560fcc3ce2""0"3"0""Wage Determination.pdf"306624"file"".pdf""1""2026-09-30T12:55:13.956+00:00""22d77f6ff1be41549eeca0d45ef1f821""public""0""public""51628a33b88a4f99ac81dbea819f2c4d""0"2"0""36C24226R0131.docx"104442"file"".docx""1""2026-09-30T12:55:13.956+00:00""24b940cabe3945dd8a009a484657e9c5""public""0""public""a8256016378d4f7b98deff2b26ca5844""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2abb548f5d824a04bdefda5e82d60545), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.