We'll email you new janitorial & custodial opportunities in California as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
***The purpose of this amendment is the following:
1 - Correct quote due date to 6 October 2026 at 5:00 PM PDT.
2 - Correct CLIN 1001 end date from 30 April 2029 to 30 April 2028.
3 - Incorporate ATTCH 10 WD 2015-5631 Rev 29 dtd 29 September 2026.
4 - Incorporate FAR 52.222-43.
5 - Incorporate revised ATTCH 1, Performance Work Statement.
6 - Post Questions and Answers
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 127EAY26Q0143 is issued as a Request for Quotation (RFQ) for Janitorial Services at Lake Tahoe Basin Management Unit Supervisors Office and Meyers Work Center.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 561720 The small business size standard is $22M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
A site visit will be held 30 September 2026 from 9:30 AM PDT to 11:30 AM PDT. The site visit will begin at the Supervisor’s Office (35 College Dr. South Lake Tahoe, CA 96150). Please send the CO, Kari Hughes, kari.hughes@usda.gov and email if you will be attending. This will be the ONLY site visit for this requirement.
Statement of Requirement
See Performance Work Statement Attch 1.
Schedule of Items – See Schedule of Items, Attch 2
Technical Data -
Technical data and supporting documentation associated with this solicitation are available through the following sources:
The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.
Attachment 1 - Performance Work Statement
Attachment 2 – Schedule of Items
Attachment 3 – 35 College Dr. – Google Map
Attachment 4 – 3030 US-50 – Google Map
Attachment 5 – Meyers Bldg A
Attachment 6 – Meyers Bldg B
Attachment 7 – Sup Office 1st Floor
Attachment 8 – Sup Office 2nd Floor
Attachment 9 – Past Performance Questionnaire
The contractor must provide all labor, equipment, supplies, and supervision to perform janitorial services at two locations: the Supervisor's Office (35 College Dr, South Lake Tahoe, CA 96150), a 24,000 sq ft building with offices, restrooms, conference rooms, and a breakroom; and the Meyers Work Center (3030 Highway 50, South Lake Tahoe, CA 96150), which includes Building A (1,600 sq ft) and Building B (1,140 sq ft), each with restrooms and breakrooms. Work includes cleaning all carpeted and non-carpeted floors, restrooms, break rooms, conference rooms, entry glass, waste receptacles, and other tasks as detailed in the Performance Work Statement. Services must be performed two days per week on Wednesdays and Sundays between 4:30 PM and 9:00 PM. The Government will provide certain consumables (soap, paper towels, toilet tissue, etc.), and the contractor must furnish all other cleaning supplies and equipment, prioritizing bio-based products.
"US""US""96150""SOUTH LAKE TAHOE""CA""USA""LAKE TAHOE BASIN MANAGEMENT UNIT""35 COLLEGE DRIVE""C05_127EAY26Q0143_P00001 Lake Tahoe Basin Janitorial.pdf"552437"file"".pdf""1""2026-10-01T20:10:47.174+00:00""cff19a44bac44e93add9019431d257cc""public""0""public""5174fcbb03504e06af69d98513040a6b""0"15"0""C05_ATTCH 1_Performance-Work-Statement Rev 1.pdf"357526"file"".pdf""1""2026-10-01T20:10:47.174+00:00""e087df8048254e63af32f2fbfc725e7c""public""0""public""2742be2bf0c64ad4b694fce3fb852891""0"14"0""C05_ATTCH 2_FS-Schedule of Items Lake Tahoe Janitorial Rev 1.xlsx"21024"file"".xlsx""1""2026-10-01T20:10:47.174+00:00""f2ce38c441374632b8faad3cc15c09f4""public""0""public""f808f1c35f0a430fbe2fd9974c05fc68""0"13"0""C05_ATTCH 10_WD 2015-5631 Rev 29 dtd 27 Aug 2026.pdf"44475"file"".pdf""1""2026-10-01T20:10:47.174+00:00""7fbfd94fa8b14e9a81f1dcf69e37f9f7""public""0""public""b65902e048fb4f84a2c6701d41fea8a8""0"12"0""C05_Lake Tahoe Basin Janitorial Questions and Answers.pdf"262835"file"".pdf""1""2026-10-01T20:10:47.174+00:00""e207623056b444ae9234e2964a59014b""public""0""public""7c3c2e650a1640a99063f6e4bdee5986""0"11"0""127EAY26Q0143_Lake Tahoe Basin Janitorial.pdf"574907"file"".pdf""1""2026-09-25T16:41:01.133+00:00""0a431cd3c5834913999032eb1210e990""public""0""public""2b1d5390858742109c7f05954d302961""0"10"0""C04_ATTCH 1_Performance-Work-Statement.pdf"344301"file"".pdf""1""2026-09-25T16:41:01.133+00:00""c2cd19b7e1364d2f8f06dbb3565e79a9""public""0""public""f6e485551454414dbef0a8ce7a550fa4""0"9"0""C04_ATTCH 2_FS-Schedule of Items Lake Tahoe Janitorial.xlsx"23383"file"".xlsx""1""2026-09-25T16:41:01.133+00:00""f3e9fe9f148e44a29bdf599a3f384656""public""0""public""af15f5c9a4a842babebf2af043b22514""0"8"0""C04_ATTCH 3_35 College Dr - Google Maps.pdf"1129851"file"".pdf""1""2026-09-25T16:41:01.133+00:00""0b96b59357e242a0bf82b4536eccc0a5""public""0""public""cb0ac320628e4797a1a3c9304dfc7249""0"7"0""C04_ATTCH 4_3030 US-50 - Google Maps.pdf"715515"file"".pdf""1""2026-09-25T16:41:01.133+00:00""d1e1b88296834ce1ad2f1055f9279fbf""public""0""public""fb7d6e4e554540709f2b433d3cf9be79""0"6"0""C04_ATTCH 5_Meyers Bldg A.pdf"607205"file"".pdf""1""2026-09-25T16:41:01.133+00:00""b41e0c2a28a54492b9ed07d7872ed086""public""0""public""3461f72809e44c3b9b3e30871962aab8""0"5"0""C04_ATTCH 6_Meyers Bldg B.pdf"822862"file"".pdf""1""2026-09-25T16:41:01.133+00:00""0d7275d538ca4da18221d57f6fe10370""public""0""public""2ad8ac699fad4073b2ca76f5789b3b60""0"4"0""C04_ATTCH 7_Sup Office 1st floor.pdf"277448"file"".pdf""1""2026-09-25T16:41:01.133+00:00""001366cb8c624774aaaaa804c1e65a3f""public""0""public""90c7eb942f28407a9ea8144a2afd3d31""0"3"0""C04_ATTCH 8_Sup Office 2nd floor.pdf"263975"file"".pdf""1""2026-09-25T16:41:01.133+00:00""0d0990cac46c496f80e4742af619d0e6""public""0""public""ca4d0efe92034becadb91dcf704d011c""0"2"0""C04_ATTCH 9_Past Performance Questionnaire.pdf"58224"file"".pdf""1""2026-09-25T16:41:01.133+00:00""0b280b1ea15f412eb7179e0e0bd2ef3b""public""0""public""97fe94574a444ecda6f13f23f2b2777f""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 29c7cdb8097740cfaa9d59eb844fe0e7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.