The contractor must inspect and test 247 fire dampers in Patient Buildings 3, 30, 14, 15, and 25 and Non-Patient Buildings 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. Work includes locating and accessing each damper, clearing debris, checking for penetrations and interference, manually activating actuators, lubricating moving parts, checking latches, resetting and replacing compromised fusible links, replacing springs and access handles, labeling each damper with a UPC label, updating drawings with damper locations, cleaning areas with a HEPA filtration system, performing necessary repairs, and providing a formal Fire Damper Report on CD with red-lined AutoCAD 2000/Adobe PDF drawings. All work must comply with current NFPA codes, Joint Commission standards, and OSHA requirements.
We post new security opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39157""RIDGELAND""MS""USA""715 SOUTH PEAR ORCHARD RD., PLAZA 1""Attachment 5 Solicitation Questions Request Form.docx"19298"file"".docx""1""2026-11-19T18:58:07.292+00:00""eba60ae688f148498954e1cfdf07a2de""public""0""public""fccfb09bbd594605b21aa4591b2f4781""0"6"0""Attachment 4 Contractor Certification.docx"17510"file"".docx""1""2026-11-19T18:58:07.292+00:00""632b2205a6bd442fb0eebec207090e09""public""0""public""4fd0f45fa69b44aeaaba93884deec1a3""0"5"0""Attachment 3 Past Performance Questionnaire.docx"27821"file"".docx""1""2026-11-19T18:58:07.292+00:00""6e8c78ae096f4d6fb01d01a8e3c95201""public""0""public""7c2fbabb2e594d468586e7e3828c39c6""0"4"0""Attachment 2 List of Past Performance References.docx"18041"file"".docx""1""2026-11-19T18:58:07.292+00:00""931c6644bf734cf890d86afdd605daec""public""0""public""cf36434d856d4bf084e479003f3f8118""0"3"0""Attachment 1 Harrison County WD 15-5147 Rev 31 dated 8-11-2026.docx"36756"file"".docx""1""2026-11-19T18:58:07.292+00:00""9cdd478bb5da452b8f23d4fdad3f1574""public""0""public""213112af52dd44409bf0e6b606c36f6e""0"2"0""36C25627Q0151.docx"573936"file"".docx""1""2026-11-19T18:58:07.292+00:00""cccfa2f1909146529651d2708b73eb35""public""0""public""378cda6770aa44f48117b491faafff39""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 284ac2d82d0447148cd0c08b202f2a49), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.