The University of California, Lawrence Berkeley National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project").
The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems.
The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site.
The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems. Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.
The Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems in Buildings 2, 26, 33, and 76. The Siemens Desigo system is specified as the campus-standard platform. The existing fire alarm wiring will generally remain in place. The project replaces central control equipment, not complete building fire alarm systems. Fire alarm annunciation and notification devices and StarLink cabinets are not being replaced, but StarLink cabinets will be relocated as needed. The work includes field verification of existing conditions, serving as Engineer of Record and Responsible Design Professional, producing PE-stamped design packages at 50%, 75%, 95%, and 100% completion, purchasing and installing new Siemens Desigo equipment, removing and disposing of obsolete panel components and legacy backup batteries, reconnecting the fire alarm system to existing StarLink communication cabinets and the central supervising station, reestablishing connections to the Energy Management Control System and building lighting controls, coordinating fire alarm outages with LBNL-provided fire watch, and testing, commissioning, and documenting the completed systems.
We post new security opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""94720""Berkeley""CA""USA""1 Cyclotron Rd""_FACPR_RFP (11.12.26).pdf"641725"file"".pdf""1""2026-11-17T21:09:34.628+00:00""2b51a2cbb57c4980b70e143e3aa1cfd2""public""0""public""93c637e9caa44c098af64268fe40a1e8""0"41"0""A_Statement of Work for Subcontract 7889840 (10.12.26).pdf"793288"file"".pdf""1""2026-11-17T21:09:34.628+00:00""7baa876270874ccc916b74239c6c9653""public""0""public""303732ec17e545738b89411d0851e1b7""0"37"0""B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf"283465"file"".pdf""1""2026-11-17T21:09:34.628+00:00""a120f7d6dd88491582a0ae943fb1b344""public""0""public""39fe805763c84c3d8f4b83746f07f944""0"19"0""C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf"235676"file"".pdf""1""2026-11-17T21:09:34.628+00:00""13ea9301497d40088d60556a86549b5b""public""0""public""54c5a639e70742bc9a73fdab4f9c5f10""0"12"0""D_Subcontract_FACRP (11.12.26).pdf"652775"file"".pdf""1""2026-11-17T21:09:34.628+00:00""4a6be412c3e84aacbd172d78bfeca051""public""0""public""b86fe0bb341d4141a5b274e58a648476""0"5"0""E_GPs for Fixed Price Design-Build (10.9.26).pdf"351765"file"".pdf""1""2026-11-17T21:09:34.628+00:00""45c9be4896bb4e70b52ba3001f5eeb43""public""0""public""c942fea907ba41f1a3fbb1c3911ac971""0"4"0""F_Insurance Certificate Instructions (10.09.26).pdf"188014"file"".pdf""1""2026-11-17T21:09:34.628+00:00""14886438287340da95c00034ad7efc68""public""0""public""8c8af6ccea1e49f3940661a1f0eb9045""0"4"0""G_Representations and Certifications Form.pdf"290694"file"".pdf""1""2026-11-17T21:09:34.628+00:00""60aa36837fbc4337baa1a4be8f698920""public""0""public""6c7f132b4b87437d8c1651d433b055d0""0"3"0""H_Small Business Subcontracting Plan (9.29.26).pdf"346725"file"".pdf""1""2026-11-17T21:09:34.628+00:00""ccf04692f89641e4b54cd00d423251b4""public""0""public""2b7a6086bf9d41bfa8954ea9c9b1dcb6""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 08b23b2676624773a82f5ef5e64db152), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.