Cripple Creek Veg Management Roads Reconstruction
CHUGACH NF
This project includes subgrade construction, unsuitable material excavation and
endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing
and grubbing,disposal site contouring, switchback realignment, waterbar construction
and reconstruction,and all other work required to get these roads to a condition to
place aggregate surface materials. Option item is road surfacing.
Questions Due:11/20
Proposals due: 12/04/2026 1700 PT
Amendment POSTED 11/23/2026 with Q&A
This project includes subgrade construction, unsuitable material excavation and endhaul, aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing, disposal site contouring, switchback realignment to accommodate a 75-foot radius for commercial log trucks, waterbar construction and reconstruction, and all other work required to get Robinette Road (1.54 miles) and Robinette Spur Road (0.31 mile) to a condition to place aggregate surface materials, with road surfacing as an option item.
We post new asphalt opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""972042829""Portland""OR""USA""1220 SW 3RD AVE STE 310""Amendment 00001 - 1240BJ27Q0009.pdf"211635"file"".pdf""1""2026-11-23T19:43:28.3+00:00""c9489310ff014ec5bc230329c79fcb7f""public""0""public""2755e5b3c1504b39bfc9de66692b323f""0"5"0""Attachment 3 Project Drawings CC Plans Full Set.pdf"1590802"file"".pdf""1""2026-11-10T17:41:35.346+00:00""f7dfe3f6aed24674a130188575efc21a""public""0""public""9afd94438fb74968ab9fd0ed867993f3""0"4"0""Attachment 4 Wage Determinations.pdf"487418"file"".pdf""1""2026-11-10T17:41:35.346+00:00""e6e5c63db945466eac5abd9d5a5a2945""public""0""public""e015cdc4b10d41e2a28029c39ae86d54""0"3"0""Attachment 2 Project Specifications CC FSSS.pdf"563658"file"".pdf""1""2026-11-10T17:41:35.346+00:00""e4a383953d2f4a34ab8c0ca6ee222fbf""public""0""public""f9d03053c64b4e6da59d7b712077b473""0"2"0""Attachment 1 Project Specifications List.pdf"89960"file"".pdf""1""2026-11-10T17:41:35.346+00:00""fe9ed1ea60fe4766bb3c19da49719b19""public""0""public""ae3f6952d6034cbe889f3775fc884133""0"2"0""1240BJ27Q0009.pdf"889723"file"".pdf""1""2026-11-10T17:41:35.346+00:00""0cbc0f05705044858315fbb5ff5226fd""public""0""public""99b129dcdb7b4b2d8a0a715ff736dc8b""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 20ffffcae06a4452803163e2bac5bdcf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.