The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST). Quoters who do not attend the mandatory site visit will be non-responsive offerors.
USDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan’s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project’s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.
Rehabilitate under-construction Parking Lot 9 including perimeter bollard protection to M50/P1 and ATFP requirements, parking lot milling and resurfacing with striping and signage, sinkhole and subsurface void investigation and remediation per Langan Option 2 with USDA and WMATA approval, electrical scope including verification of installed service and traffic arms and badge readers, grading, granite curbs, landscaping with irrigation, moat rail restoration with lead abatement, updating incomplete 2021 drawings and specifications to 100% design, WMATA and DDOT coordination and permits, and phased construction within eleven and one-half months of NTP.
We post new asphalt opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80521""FORT COLLINS""CO""USA""PROC OPERATIONS DIV-AMD (3144)""301 S. HOWES STREET, STE. 321""INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf"424237"file"".pdf""1""2026-11-20T01:23:39.979+00:00""9a4704a6fced4a3e936a8b56feae17ce""public""0""public""85688b31196d4468ae01133c308ed9a3""0"76"0""RFQ 124PCA27Q0002 SF1442.pdf"106194"file"".pdf""1""2026-11-20T01:23:39.979+00:00""e1c80551f5ae4e14bf0950e99de26378""public""0""public""cc3c4417a95343aea49d8873125221cd""0"75"0""Attachment 1 SOW Lot 9 11.19.2026.pdf"334706"file"".pdf""1""2026-11-20T01:23:39.979+00:00""3ae2bce6d4d942f9891089f8e83d29a9""public""0""public""dc826587657142ac9724e616481c2ff2""0"73"0""Attachment 2 FAR and AGAR Clauses.pdf"225208"file"".pdf""1""2026-11-20T01:23:39.979+00:00""0d5e91d0124a42989d3caec297cdfd32""public""0""public""bf0d9320636c448fa62d8fd00237d5c7""0"72"0""Attachment 3 Davis Bacon Wage Determination 11.13.2026.pdf"69420"file"".pdf""1""2026-11-20T01:23:39.979+00:00""47ab09a359ac43b88ab16835de3ac866""public""0""public""3ef25aa2d60d4deb8ba00b9b891c440e""0"71"0""Attachment 4 Aerial view of USDA Headquarters.pdf"151152"file"".pdf""1""2026-11-20T01:23:39.979+00:00""0e6fd6bbede840c1a1bbfe769c444a3a""public""0""public""c9817ef823e74af6a9a90dcda8fe1c9e""0"70"0""Attachment 5 Location Map Lot 9.pdf"52159"file"".pdf""1""2026-11-20T01:23:39.979+00:00""ae06ef53bd224af8b1dff0b0cd72daa9""public""0""public""99062454d8e04c9aa532a0d68e83ac6e""0"69"0""Attachment 6 Below Grade Metro Site Map at Lot 9.pdf"63061"file"".pdf""1""2026-11-20T01:23:39.979+00:00""6868bfbae2974f85a99bb4c664a1cb2a""public""0""public""86e480dcb2ed4c8a841381dd352e73e7""0"68"0""Attachment 7 Signage and Pavement Marking Plan at Lot 9.pdf"61740"file"".pdf""1""2026-11-20T01:23:39.979+00:00""9b3620fd48db49adac36673d8ccfb586""public""0""public""28909fb0901b484e9052b874aec6c003""0"67"0""Attachment 8 SOW Original Lot 9 design reference only 06.20.2022.pdf"1235329"file"".pdf""1""2026-11-20T01:23:39.979+00:00""f5090f91cafe43248467c7a35209404a""public""0""public""862a229b4fcf47ad8f3261b822515053""0"66"0""Attachment 9 AECOM Drawing CIV 103 SITE AND UTILITY DRAWING.pdf"121900"file"".pdf""1""2026-11-20T01:23:39.979+00:00""b9ec00d36af24fda809894d6142931db""public""0""public""03e67bf898634ae5a5ce48c0d2b84ea2""0"65"0""Attachment 10 Electrical Scope addendum by JPA Inc 10.29.2025.pdf"172375"file"".pdf""1""2026-11-20T01:23:39.979+00:00""f72de65174be4ee4b25f7117d3ea8bd6""public""0""public""e1cc032b75d14d3faca3ad95099c5759""0"64"0""Attachment 11 Langan Geotechnical Report 01.28.2026.pdf"10477587"file"".pdf""1""2026-11-20T01:23:39.979+00:00""27508c2a4ffc4265a7d19723f5d0e1b7""public""0""public""4b42bd4439004601a08bc004f6a42d23""0"63"0""Attachment 12 USDA Whitten Lot 9 100pct drawing submission 04.16.2021.pdf"29294166"file"".pdf""1""2026-11-20T01:23:39.979+00:00""c2717b4647aa4b51b42e325d00906080""public""0""public""8d5f8f2b85e4488b9d7e31c27731505c""0"62"0""Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.2021.pdf"3650837"file"".pdf""1""2026-11-20T01:23:39.979+00:00""b16900bdadf74ec0a7636ecb66c557c1""public""0""public""7f50c504b5ac44ff90f73af1e30095eb""0"61"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d3fce3c7270549ef89659e2d3afe299a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.