The 354th Eielson Contracting Squadron is seeking qualification packages for A&E service for the project below:
The Government requires A-E Title I investigation and design services for the repair and renovation of Nose Dock 7, Building 1232, at Eielson AFB, Alaska. The objective is to develop a complete and coordinated design that addresses the facility deficiencies and operational requirements identified in this SOW and provides the basis for a future construction acquisition. The scope also includes Title II construction-phase design support as identified in this SOW. Construction execution is not included in this effort.
This information will be utilized to prepare comprehensive drawings, schedules, specifications, and cost estimates for all facets of work and disciplines/trades involved in the construction project. The primary objective is to develop a biddable set of construction documents tailored to address the unique challenges presented by the extreme Arctic conditions at Eielson AFB, AK.
Notices to Offerors: This RFQ is a request for information and not to be confused with a request for proposal (RFP). This RFQ is strictly used by the Government to conduct market research for determining the three (3) most highly qualified offerors.
The contract schedule set fourth in the statement of work requires a delivery of 100% in 282 calendar days.
If this is something your firm is interested in and accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF-330 (Architect-Engineer Qualification-Standard Form 330), and PPQ (Past Performance Questionnaire) to 354CONS.PKA.Designs@us.af.mil.
All questions regarding this RFQ must be emailed to the e-mail addresses above by 3:00 P.M. AKT on 27 November 2026. Responses will be provided by COB 2 Dec 2026.
The work is A-E Title I investigation and design for repair and renovation of the 1965 aircraft maintenance hangar Building 1232, including fire protection and fire alarm design, Wheel and Tire Shop fire-rated doors, new mezzanine and office areas, renovation of existing east and north office areas, roof and structural repairs with 60-mil PVC membrane system, limited HVAC modifications, comprehensive hazardous materials survey and abatement plan, and development of drawings, specifications, design analyses, cost estimates, schedules and DD Form 1354 through 35%, 65%, 95% and 100% submittals, plus Title II RFI responses, submittal reviews, interpretations and site visits.
We post new architecture and design opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"99702-2200""EIELSON AFB""AK""USA""CP 907 377 5207""2310 CENTRAL AVE STE 3""05. FTQW062467, Repair Nose Dock 7, A-E Small Bus. RFQ, COA 17 Jul 26.pdf"221125"file"".pdf""1""2026-11-10T19:00:25.192+00:00""e273fdbcb1d440c680e2653ed5f596ea""public""0""public""d748db72bf0446948f8a978ae5278e6c""0"7"0""03c. FTQW062467, Repair Nose Dock 7, Pictures Set 2.pdf"14156975"file"".pdf""1""2026-11-10T19:00:25.192+00:00""27f3aab733834edbb00b00179ad11fd0""public""0""public""fad083e25a874be795dbcc98c40c3e81""0"6"0""03c. FTQW062467, Repair Nose Dock 7, Pictures.pdf"3650187"file"".pdf""1""2026-11-10T19:00:25.192+00:00""75512ae5d9e74e0ea15dc3a7b861114a""public""0""public""c1dcf8054cf945d38bcbb18266db7488""0"5"0""03. FTQW062467, Repiar Nose Dock 7, SOW R2, COA 03 Sep 26.pdf"298894"file"".pdf""1""2026-11-10T19:00:25.192+00:00""15f52f4bb5e344519df33c8d5be98153""public""0""public""e9fc35fe93954f86bf0d80286ca9806a""0"4"0""Past Performance Questionnaire FTQW 26 1104.pdf"579677"file"".pdf""1""2026-11-10T19:00:25.192+00:00""5a6ea2b05a7a4195bd3669c983536cec""public""0""public""b44058e9b2d04f3a936ea71383663dde""0"3"0""SF 330-Revised 7-21 1.pdf"416895"file"".pdf""1""2026-11-10T19:00:25.192+00:00""4c3cf3357c3b47d88b878b6611a99f2e""public""0""public""5e4932191528446e9d32c8abaee7514c""0"2"0""03b. Basis of Estimate REPAIR NOSE DOCK 7.pdf"159283"file"".pdf""1""2026-11-10T19:00:25.192+00:00""96edcf53dbdc439197d0196be57d45ee""public""0""public""d2aecd24c711447f8edd863559f623d4""0"1"0"Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1992f05a9cf242f3a9bc900260158a11), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.