The Bureau of Land Management¿s National Historic Trails Interpretive Center requires the removal and replacement of four heating and cooling system pumps, associated motors, and five Variable Frequency Drives (VFDs). Work includes disposal of existing equipment, installation of new pumps and VFDs, integration with the Johnson Controls Metasys building automation system, and completion of a certified third¿party Testing and Balancing (TAB) process. Contractors must hold transferable journeyman plumbing and electrical licenses and adhere to all applicable codes. The performance period is 210 days, with required submittals including equipment data, TAB reports, Metasys system reports, safety plans, schedules, and O&M documentation.
Site Visit:
A site visit is scheduled for October 5, 2026, at 2:00 PM MDT at:
National Historic Trails Interpretive Center
1501 N. Poplar Street
Casper, Wyoming 82601
Vendors planning to attend the site visit are requested to RSVP to Steve Hollister at shollister@blm.gov.
Period of Performance: 11/01/2026 - 05/31/2027
Basic Contracting Requirements:
Instructions to Offerors:
Primary POC: Contracting Officer Crystal Martinez - crystal_martinez@ios.doi.gov - 307-775-6336
Work includes disposal of existing equipment, installation of new pumps and VFDs, integration with the Johnson Controls Metasys building automation system, and completion of a certified third-party Testing and Balancing (TAB) process. Required submittals include equipment data, TAB reports, Metasys system reports, safety plans, schedules, and O&M documentation.
We post new hvac opportunities in Wyoming as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""82009""CHEYENNE""WY""USA""5353 YELLOWSTONE RD""Sol_140L6226Q0034.pdf"416051"file"".pdf""1""2026-09-24T02:14:05.247+00:00""6552c694acd64d11932cf36d2b064c7b""public""0""public""243f1f018dcc4d0a9b0f135805038d55""0"5"0""Attachment_2-_Quote_Schedule.xlsx"26271"file"".xlsx""1""2026-09-24T02:14:05.247+00:00""d5c8cec87c6043608870666c86fd9ca7""public""0""public""7d4b1e1cbd6d4ca4bb85433dc8e3cde1""0"4"0""Attachment_3-_Drawings.pdf"1673908"file"".pdf""1""2026-09-24T02:14:05.247+00:00""bc3b732a284a49f89cf073563914c7f0""public""0""public""c129558b94e94cc7822b2aa6d252a4c2""0"3"0""Attachment_1-_Statement_of_Work.docx"38753"file"".docx""1""2026-09-24T02:14:05.247+00:00""4ecd580e43524482ada7b553fb68c980""public""0""public""17de6ba58be3485e9a975cd1c5b20cf7""0"2"0""Attachment_4-__Wage_Determination_2015-5413_Rev30_posted_8-22-26.pdf"65894"file"".pdf""1""2026-09-24T02:14:05.247+00:00""14416bade24a48559a99e03d4541a2db""public""0""public""eb99500a98634489812e9d653e223b4d""0"1"0"Most Wyoming work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 18e0965f9c984199b83419d390e9c875), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.