Project Title/Location: DESIGN-BID-BUILD P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI
SOLICITATION NO. N4008526R0178
This acquisition is being solicited on an unrestricted basis with full and open competition.
THIS SOLICITATION INCLUDES CMMC LEVEL 1 (SELF) REQUIREMENTS IN ACCORDANCE WITH DFARS 252.204-7025 (DEVIATION 2026-0038) AND 252.204-7021 (DEVIATION 2026-0038).
This project is considered a “Large-scale Construction Project” as defined in FAR 22.502 (DEVIATION 2026-O0040). Accordingly, the requirements of FAR Subpart 22.5 (DEVIATION 2026-O0040) will apply. The Offeror shall submit a signed Project Labor Agreement with their Price Proposal submission, in accordance with FAR Provision 52.222-33 (DEVIATION 2026-O0038) and FAR Clause 52.222-34 (DEVIATION 2026-O0038). Offerors that do not include a signed Project Labor Agreement complying with the terms of FAR 52.222-33 (DEVIATION 2026-O0038) and 52.222-34 (DEVIATION 2026-O0038) shall be considered nonresponsive and ineligible for award.
All correspondence regarding this solicitation shall be directed via email to Demetrice Jenkins at demetrice.jenkins2.civ@us.navy.mil.
Description of Work:
This design-bid-build project will include the construction of a multi-story steel frame 12,920 SF laboratory and office facility. The facility will support a variety of functions including depot level testing of critical torpedo systems. Construction consists of a steel frame building with a shallow foundation, metal standing seam roof and masonry and metal panel exterior walls. The project includes all pertinent site preparations and site improvements, including underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking and exterior lighting.
For Option 1, P1016 Consolidated RDT&E Systems Facility, this project will include the construction of a multi-story 17,978 SF laboratory facility supported by shallow foundations. The facility will utilize structural steel framing with a standing-seam roof. Exteriors are planned as a combination of masonry veneer and metal panel siding. Demolition includes removal of Building 1272T, a 548 m2 engineering facility.
The project includes the construction of a multi-story steel frame 12,920 SF laboratory and office facility to support depot level testing of critical torpedo systems. Construction consists of a steel frame building with a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. The project includes all pertinent site preparations and site improvements, including underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. For Option 1, P1016 Consolidated RDT&E Systems Facility, the project includes the construction of a multi-story 17,978 SF laboratory facility supported by shallow foundations, utilizing structural steel framing with a standing-seam roof, and masonry veneer and metal panel siding. Demolition includes removal of Building 1272T, a 548 m2 engineering facility.
We post new general contractors opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Amendment 0009 N4008526R0178.pdf"714697"file"".pdf""1""2026-11-23T18:17:59.939+00:00""28f9b7f353a7435e844c961908b6ce86""public""0""public""f8334872f4eb43a180ede96198479d84""0"49"0""JA ML2681 26R0178 Redacted.pdf"639938"file"".pdf""1""2026-11-21T00:00:45.518+00:00""c03e64ba93c94856bf84258e0e425e8e""public""0""public""223e4325c5894444b8eba671e9fa7782""0"48"0""P-084 Amendment 0008 - Drawings R1.pdf"8743685"file"".pdf""1""2026-11-21T00:00:45.518+00:00""e9521b7c52f04520a8070a4441184eae""public""0""public""68c5c55190474bee84d44d61f2011aae""0"47"0""P1016-C-503.pdf"1471779"file"".pdf""1""2026-11-21T00:00:45.518+00:00""d2d6ab5231f8495ba0508d06f100c8c9""public""0""public""7188b7476ad44aef96ac8aeba40ffe9c""0"46"0""P-1016 Amendment 0008 - Continuation.pdf"697662"file"".pdf""1""2026-11-21T00:00:45.518+00:00""0751af1b20d64af5bf552336dc4240dc""public""0""public""610b6fe7b5fa45e7a24131949b633298""0"45"0""P-084 Amendment 0008 - Continuation Doc R1.pdf"114645"file"".pdf""1""2026-11-21T00:00:45.518+00:00""f1c4bd4072fb4f0786119604cceedba5""public""0""public""8eefec6a3fac4dbc9fbe966f33c834fb""0"44"0""Attachment H -Price Proposal Form_Rev 2.pdf"173280"file"".pdf""1""2026-11-21T00:00:45.518+00:00""d8df97d3939c4722b67b6df61ee1dbc2""public""0""public""9d697401b21f43b18c9dcd8110a9682e""0"43"0""07 27 10 Building Air Barrier System.pdf"28077"file"".pdf""1""2026-11-21T00:00:45.518+00:00""8c591e03f38d4cd99a6920746803f870""public""0""public""2eb8e1b606f7437ea9614d345487454e""0"42"0""Amendment 0008 N4008526R0178.pdf"841773"file"".pdf""1""2026-11-21T00:00:45.518+00:00""a58b0927b707443a87a51b06fe5c9569""public""0""public""b626589b6d4d44d08ac2a890971997ee""0"41"0""Amendment 0007 N4008526R0178.pdf"79095"file"".pdf""1""2026-11-16T21:55:23.294+00:00""24d95b7bd6be4dbe88137b5b7275dbad""public""0""public""4db261227820410ea49173dd4ee0a6fe""0"40"0""Amendment 0006 N4008526R0178.pdf"60443"file"".pdf""1""2026-11-05T23:18:21.888+00:00""f7d6d3d160af4d85a47fcd68d2b00a9c""public""0""public""ec4dcf604a2546acafe4552037594c0b""0"39"0""Attachment J - WD RI20260001 10-1-26.pdf"57156"file"".pdf""1""2026-11-05T23:18:21.888+00:00""ec344fe480404efa92ca7968ae157bdb""public""0""public""03e04a6a8002420682d3526c283257e6""0"38"0""Attachment H -Price Proposal Form_Rev 1.docx"55688"file"".docx""1""2026-11-05T23:18:21.888+00:00""91db3b317fa6499eb01241ec48508de5""public""0""public""2f09eb3e8fcb41a5bf527100be27dc38""0"37"0""Amendment 0006 PPI Responses.pdf"282310"file"".pdf""1""2026-11-05T23:18:21.888+00:00""a6019fa09c3f4564b0c330c578b2d6cb""public""0""public""84b68985a65d43879bf2467f052cd73c""0"36"0""P-084 Amendment 0006 - Continuation.pdf"122794"file"".pdf""1""2026-11-05T23:18:21.888+00:00""b2e42200ed2d4e409e682cc51304a575""public""0""public""05046cab81194961a6b60880309a5ff0""0"35"0""P-1016 Amendment 0006 - Continuation.pdf"589809"file"".pdf""1""2026-11-05T23:18:21.888+00:00""3558b0b65c9340b09aaa2a35fd3c1f54""public""0""public""c232556eef734b089c11d48ea2ddfa9b""0"34"0""P084 - Amendment 006 Drawings.pdf"26614214"file"".pdf""1""2026-11-05T23:18:21.888+00:00""c637d9198beb48d2810c176cc94f1db2""public""0""public""975c61e1a2ef4baa9b0901cd8773ed5d""0"33"0""P1016_Civil C-131.pdf"1019470"file"".pdf""1""2026-11-05T23:18:21.888+00:00""10ad1a43db584ed9b6d95436ab498149""public""0""public""f154f20f76494f0eb4187b0103178786""0"32"0""00 01 15.pdf"93130"file"".pdf""1""2026-11-05T23:18:21.888+00:00""608c993a423a4e118cff04244e28317c""public""0""public""a7f3fbf80ca840e1bfc8396c112b5f8e""0"31"0""01 30 00.pdf"25329"file"".pdf""1""2026-11-05T23:18:21.888+00:00""a837ca649f83415bb1f3f75c726eadc1""public""0""public""d6a16d501d3143e2b06bab6c74432020""0"30"0""01 33 00.pdf"71615"file"".pdf""1""2026-11-05T23:18:21.888+00:00""2b106a8049a0456c8b61b23b0af1222d""public""0""public""06f28bcd971a4d82ade666424f1666d5""0"29"0""02 82 00.pdf"101646"file"".pdf""1""2026-11-05T23:18:21.888+00:00""112e91830f6f4b5cafef1eb2059f13e1""public""0""public""05677d9e6b474713877f3d931ed4b989""0"28"0""23 07 00.pdf"150983"file"".pdf""1""2026-11-05T23:18:21.888+00:00""acec0a34c7fb4a28b54bab70e3e64fe3""public""0""public""4ebff384e3c74919846837dd5d7ba31f""0"27"0""23 22 26.00 20.pdf"65134"file"".pdf""1""2026-11-05T23:18:21.888+00:00""fbca28d7efe5488ea09217cab0ac3d11""public""0""public""28a1883a044a45a399399a4ebdf7ae78""0"26"0""28 10 05.pdf"146337"file"".pdf""1""2026-11-05T23:18:21.888+00:00""9c4e3e1d96204c9a9ad9530f45a1c2c7""public""0""public""24f22eab02244163aaa7267f28b5bc0a""0"25"0""32 31 13.53.pdf"31250"file"".pdf""1""2026-11-05T23:18:21.888+00:00""fed64d08b3a54756898b053bbb9fcea9""public""0""public""9ce6886fad1f48f796ba1a75ad4a61bd""0"24"0""33 63 13.pdf"79560"file"".pdf""1""2026-11-05T23:18:21.888+00:00""116d5e542b2b403abee85b502fc6feb0""public""0""public""b7e651a222a34a1b971b87f1757aafec""0"23"0""High Performance and Sustainable Building Checklist.pdf"248032"file"".pdf""1""2026-11-05T23:18:21.888+00:00""946fe59d766f42f78334997d8efc7bb6""public""0""public""7ddd0d4908f6408584dffb7a2d768ede""0"22"0""Amendment 0005 N4008526R0178.pdf"57985"file"".pdf""1""2026-10-23T12:45:13.704+00:00""4bf2eea719bb467783454cbfcc50d508""public""0""public""7a06096de8ec4c68bf3c4ab667c61e94""0"21"0""Amendment 0004 N4008526R0178.pdf"676776"file"".pdf""1""2026-10-08T21:59:43.628+00:00""5fecb5394a414c8a959881671ca57896""public""0""public""44075108cfbe4503a31cc49a706c87bb""0"20"0""Amendment 0004 PPI Responses.pdf"299716"file"".pdf""1""2026-10-08T21:59:43.628+00:00""8695c52c45754a4abdbbd5fcb05cd49e""public""0""public""c401914491d740e3a968e492bbbd6ec5""0"19"0""Amendment 0003 N4008526R0178.pdf"600922"file"".pdf""1""2026-09-10T15:16:26.954+00:00""6291a0655b354e26bf8fdfa21baaa89b""public""0""public""1d67075091a04ca8b1f434e66f6acf12""0"18"0""Amendment 0002 - N4008526R0178.pdf"641123"file"".pdf""1""2026-09-02T19:52:13.693+00:00""40f03ddf83534ebc9f3832021712a054""public""0""public""1c44cca7a002462688a38ae5b0fae592""0"17"0""Amendment 0001 - N4008526R0178 .pdf"224713"file"".pdf""1""2026-08-20T20:10:23.477+00:00""00292af3cdf84bda89e2e58538ced7e9""public""0""public""3307743e35fb488f8a3a56ee5acd75a7""0"16"0""Solicitation - N4008526R0178.pdf"1056805"file"".pdf""1""2026-08-13T22:24:55.177+00:00""26034d4d8fc7440cbf8eb8f3fe330980""public""0""public""88c8905a882042efb5c32bec1b1b1072""0"15"0""Attachment A - Pre-Proposal Inquiry Log Template.xlsx"11581"file"".xlsx""1""2026-08-13T22:24:55.177+00:00""42f00707c114449db600d64665e0a384""public""0""public""7f1afde9d6ec4a34afcbde85ad6c99ca""0"14"0""Attachment B - PIEE Vendor Access Instructions.pdf"521756"file"".pdf""1""2026-08-13T22:24:55.177+00:00""ad384ef45f284bde9d74c7a07862d131""public""0""public""3b3b626dba634801ba300b2514d3fc89""0"13"0""Attachment C- Construction Experience Project Data.docx"19617"file"".docx""1""2026-08-13T22:24:55.177+00:00""b563347ccaa24998960f5872ec783639""public""0""public""23f7f58c75ce487abd30513f4a2b746e""0"12"0""Attachment D- Past Performance Questionnaire.docx"36530"file"".docx""1""2026-08-13T22:24:55.177+00:00""a538a827ff8248c0929f6cdc0c9a82bd""public""0""public""2e3ec71ecd4245f787359a30ff930513""0"11"0""Attachment E- Historical Small Business Utilization.docx"46261"file"".docx""1""2026-08-13T22:24:55.177+00:00""3e33ba0599754eb7aad05d91a87ff0c0""public""0""public""b643601095f44b60a074dc87ce2c1995""0"10"0""Attachment F-Small Business Participation Commitment.docx"35546"file"".docx""1""2026-08-13T22:24:55.177+00:00""ef052e7b10934662bde2dac289e98d2a""public""0""public""bf4ef6ea9bba493ba7bdf390cd7d3598""0"9"0""Attachment G - Individual SB Subcontracting Plan.docx"70194"file"".docx""1""2026-08-13T22:24:55.177+00:00""bc111e457b5e431a920160d6a0c753f5""public""0""public""08e1c709dcea478397fe6e6810918873""0"8"0""Attachment H -Price Proposal Form.docx"50813"file"".docx""1""2026-08-13T22:24:55.177+00:00""b1553f5c609646c3a98e5994eeef22cd""public""0""public""82558938bf0c466ba7ec5345cccc970f""0"7"0""Attachment I - SECNAV FORM 5512.pdf"1090730"file"".pdf""1""2026-08-13T22:24:55.177+00:00""179a1e50b74b416ca8e554441ee4f916""public""0""public""d778eb20e32d4109ba865b0009d7f508""0"6"0""Attachment J - WD RI20260001 7-30-2026.pdf"199904"file"".pdf""1""2026-08-13T22:24:55.177+00:00""4a7179c7a1af4df5b7cb13f0a21f82da""public""0""public""5ca85ef4a65349cfb3ade48b72239e4c""0"5"0""NUWC P-1016 - Specifications.pdf"19155001"file"".pdf""1""2026-08-13T22:24:55.177+00:00""92844619209247e0b38143a00bcfd73c""public""0""public""dc35d0313eb443c098b09084c264fddc""0"4"0""NUWC P-1016 - Drawings.pdf"154010270"file"".pdf""1""2026-08-13T22:24:55.177+00:00""4d505e5f7b56405a853a0169e02b3d0b""public""0""public""673d366ac8464dd1a7d65723f13f5af7""0"3"0""NUWC P084 - Specifications.pdf"14880802"file"".pdf""1""2026-08-13T22:24:55.177+00:00""b9b70b2baad741a8911cdeb02c018d25""public""0""public""f35add0796b246a0aabefa18d94156f6""0"2"0""NUWC P084 - Drawings.pdf"94744228"file"".pdf""1""2026-08-13T22:24:55.177+00:00""5de0b050b9604077bbad45aff2e7b62a""public""0""public""5ac33f6deac246ef82631a31c6bb551d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1627e411ca0b48fb8ac8a56048f5e743), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.