INSTRUCTIONS TO REQUEST ACCESS TO RESTRICTED DOCUMENTS
Bidders must submit an access request through the SAM.gov "Controlled" document access system. To be approved for access, the Contractor must satisfy the following criteria:
STEP 1: SUBMIT THE ACCESS REQUEST IN SAM.GOV
In SAM.gov, locate the "Controlled" attachments under the "Attachments" section of this solicitation and click "Request Access."
STEP 2: PROVIDE CAGE CODE AND CMMC UNIQUE IDENTIFIER (UID)
In the "Reason for Access" text field, you MUST provide the following details:
Active Company CAGE Code (Must be active in SAM.gov).
Company CMMC Unique Identifier (UID) / SPRS Entry ID.
CYBERSECURITY MANDATE (DFARS 252.204-7019 / NIST SP 800-171)
Bidders are strictly cautioned that this project incorporates DFARS 252.204-7019 (Notice of NIST SP 800-171 DoD Assessment Requirements).
In accordance with DFARS 252.204-7019, the Contracting Officer is legally prohibited from awarding this contract to any bidder who does not have an active NIST SP 800-171 assessment score posted in SPRS at the time of award evaluation. Bidders are encouraged to ensure their SPRS postings are current (completed within the last 3 years) prior to proposal submission.
POINTS OF CONTACT (POC)
If you experience technical issues requesting access through SAM.gov, please contact the SAM.gov Help Desk. For contractual, legal, or project-specific inquiries, contact the following individuals immediately:
Michael Ouellette - Michael.N.Ouellette.civ@us.navy.mil
Provide firm-fixed-price design services including concept, schematic, design-development and final construction documents for structural steel, foundations, ventilation and Class I Division 1 and Division 2 systems compliant with NFPA 58, NFPA 70, NFPA 72 and ASME standards, then perform physical construction in accordance with the approved 100% final design, including environmental management for testing, staging and disposal of contaminated soil under the Naval Station Soil Management Plan, generator and hazardous materials usage reporting, and compliance with EM 385-1-1 and OSHA standards.
We post new general contractors opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"02841-1703""NEWPORT""RI""USA""1176 HOWELL ST""Attachment_6_SITE VISIT INSTRUCTIONS .pdf"344996"file"".pdf""1""2026-11-17T18:11:53.416+00:00""acf64a1aac9d43d88f6ce8077954a4d8""public""0""public""9c7b0dfc967d4fbca469adecf6d0fb40""0"6"0""Attachment_5 Generator Usage Log.pdf"1147436"file"".pdf""1""2026-11-17T18:11:53.416+00:00""5003df25e0b64e9ab0e01d9163cbada2""public""0""public""dc14d99547f74630998146a8437fdc2a""0"5"0""Attachment_4- Hazmat Usage Log.pdf"1848744"file"".pdf""1""2026-11-17T18:11:53.416+00:00""c9f7861117f34a2693ad9a12e3ed90fc""public""0""public""3744da3e478d4b7d85b6eb94338b6b12""0"4"0""Davis Bacon WD RI20260001_10_1_2026.pdf"6158678"file"".pdf""1""2026-11-17T18:11:53.416+00:00""e5fad28c25cd4a4aa567807a71825fd4""public""0""public""3f5e602d07564b9185ccf557d030e6a9""0"3"0""Attachment_1_and _2_ Specification and Drawings- Design-Build (SOW).pdf"20777241"file"".pdf""1""2026-11-17T18:11:53.416+00:00""2ed9a213ff9d432d863037a2099d22d3""private""0""controlled""30e85b36c24f4d2e93222c9786513701""1"2"0""N6660427Q0077.pdf"330218"file"".pdf""1""2026-11-17T18:11:53.416+00:00""43ef7f6d197a4b05acf4e1d7ecf8f74b""public""0""public""890a6f21dc90425b873ad6724a08b414""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0fa8a35e5a85495a973b109815840c81), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.