This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.
Solicitation number 127EAW26Q0028 is issued as a Request for Quotation (RFQ) for the Red Rock Lookout Renovation on the Plumas National Forest. The goal of this project is to complete deferred maintenance upgrades to the existing Red Rock Lookout. This includes but not limited to roofing, lightning protection system, off-grid solar infrastructure, exterior finishes, interior finishes and other utility piping.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 236220. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency.
06/09/26 - Amendment 01 Posted: Summary - Change the due date for receipt of quotes and questions. Estimated start work date is changed.
06/23/26 - Amend 02 posted: Summary - Change the due date for receipt of quotes. Estimated start work date is changed.
8/27/26 - Amendment 03 posted: Summary - Add organized site visit information.
9/18/26 - Amendment 04 posted: Summary - Changes to the SOW, quote due date, and DBA Wage Determination. Amendment also includes questions and answers to date.
The work includes demolition, exterior prep and lead paint remediation, roofing, shutter repair, solar system and electrical installation, lightning protection system, interior flooring, doors and hardware, casework, plumbing fixtures and appliances, miscellaneous woodwork, and interior prep and paint. The contractor must also design and install a complete off-grid photovoltaic system with battery storage, a propane water heater, a propane wall heater, a drop-in sink, a refrigerator, a stove, a water tank with pump, and all associated piping and electrical infrastructure. Lead-based paint abatement and encapsulation is required per specification 028319.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""Attachment 7 - DBA WD CA20260007 Amend 04.pdf"22314086"file"".pdf""1""2026-09-18T21:35:22.474+00:00""e9581d55e17f4722abd23f016d880023""public""0""public""40409ca8bea241d8b1105865cfc5b33d""0"15"0""Amend 04 RFI1-Site Photos.pdf"1277962"file"".pdf""1""2026-09-18T21:35:22.474+00:00""ac3775e6a5104465ad749d890202ff1f""public""0""public""15d7baeea3af4209947797ac3511b2ed""0"14"0""Attachment 3-SOW Amend 04 091626.pdf"1289251"file"".pdf""1""2026-09-18T21:35:22.474+00:00""2979998f67d349bfb5a52af54b73dd59""public""0""public""840cb800dc694931883c9f2119f8f76d""0"13"0""Amendment 04 Red Rock Lookout.pdf"415345"file"".pdf""1""2026-09-18T21:35:22.474+00:00""0d51e5bc968948dc9f101e59cfd19733""public""0""public""f90bf1146c274faf97cbb9d8af02702c""0"12"0""Amend 04 RFI2-Red Rock Drafting Location.pdf"87429"file"".pdf""1""2026-09-18T21:35:22.474+00:00""35f20bdcc16c467982dde545a9bc7c3d""public""0""public""4309a3f47d494360ac0d0bb0e12a16fd""0"11"0""Amendment 03 Red Rock Lookout.pdf"91937"file"".pdf""1""2026-08-27T14:43:14.348+00:00""9f43311fc7a44240a826a5e645b011c7""public""0""public""4574c4dcb940478097272d7fba7bc944""0"10"0""Amendment 02 Red Rock Lookout Renovation.pdf"90841"file"".pdf""1""2026-06-23T21:12:58.04+00:00""45972c8c484443b285d3bcafbd1c30e1""public""0""public""da1ab693d7634af6bb18f104a67e18ec""0"9"0""Amendment 01 Red Rock Lookout Renovation.pdf"90423"file"".pdf""1""2026-06-09T19:04:18.602+00:00""3b8d8d585ced4232a719d5ef5186ff0c""public""0""public""c8aee2bc44734bb6bead79e9100ef61e""0"8"0""Attachment 7 - DBA WD CA20260007 Plumas Co 051826.pdf"15607809"file"".pdf""1""2026-05-28T18:14:08.838+00:00""e5187cd4831248ec837d6e6bbaf80fd4""public""0""public""355228ba14fc4201b56bdadb5d17ab5d""0"7"0""Attachment 6 - Map to Red Rock Lookout.pdf"4024631"file"".pdf""1""2026-05-28T18:14:08.838+00:00""73431d8cbfe54aa4a59318664350f52b""public""0""public""404c27c2feaf4e70878d4e202fe1dbd2""0"6"0""Attachment 3 - SOW_Red Rock Lookout Renovation.docx"2106475"file"".docx""1""2026-05-28T18:14:08.838+00:00""307c82c2cbb243ca88c5a7013c245273""public""0""public""b9baa22761454771a3f4259697491d02""0"5"0""Attachment 5 - Plan_Drawings Red Rock Lookout Renovation.pdf"1909060"file"".pdf""1""2026-05-28T18:14:08.838+00:00""164241d7113944ee87d397d634f7ea61""public""0""public""58ca6148abff4b51ba731f60be8abf70""0"4"0""Attachment 4 - Specifications Red Rock Lookout Renovation.pdf"1900018"file"".pdf""1""2026-05-28T18:14:08.838+00:00""ea6bed0435584b3b9db1b4a3ed45ca94""public""0""public""174291f504e14732a53e23f10d714401""0"3"0""Attachment 1 - Solicitation Red Rock Lookout Renovation.pdf"1029133"file"".pdf""1""2026-05-28T18:14:08.838+00:00""9c24619f78e64f37bc2d0a58ffe900d3""public""0""public""ee41584b828a4589a0dad4b6efd7d249""0"2"0""Attachment 2 - SOI Red Rock Lookout Renovation.xlsx"14032"file"".xlsx""1""2026-05-28T18:14:08.838+00:00""e3736dd1a22a470e9d0e19d7fe29d3de""public""0""public""75949f0dc31b4239a547943362e6a3e5""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 12e3b3eda72b458b95a26d23c28c6203), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.