We'll email you new general contractors opportunities in Michigan as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12445527Q0001 is issued as a Request for Quotation (RFQ) For the Removal and replacement of an existing concrete bridge with a 70 foot (overall length) single span concrete I-girder bridge with a concrete deck, concrete abutments, and H-pile foundations.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 Highway, Street, and Bridge Construction. The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor provides all labor, materials and incidentals to remove the existing 51-foot concrete T-beam bridge and build a 70-foot single-span prestressed concrete I-girder bridge with concrete deck, abutments on H-pile foundations, bridge railing, approach slabs, guardrail, riprap, drainage, erosion control, seeding and traffic control, per FP-14 specifications.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""Sol_12445527Q0001.pdf"283845"file"".pdf""1""2026-10-05T13:59:22.113+00:00""5e3eb0f0fdc94e99a9e1ba23f4142b7e""public""0""public""71fd3fb22b22483598c9058de9209a29""0"7"0""Att 01_Schedule of Items_260831.docx"26523"file"".docx""1""2026-10-05T13:59:22.113+00:00""cd191dc370a44270a1a4f9e3a3c60e2e""public""0""public""92ddfa31b9b941fbaacf42cd8f130932""0"6"0""Att 02_Plans 11x17_250805.pdf"31050129"file"".pdf""1""2026-10-05T13:59:22.113+00:00""f43c1c85d63a4f68bb8e1c96514dc89b""public""0""public""46c23c7820654b58b1186de7a46756d1""0"5"0""Att 03_Supplemental Specs_260727.pdf"1797585"file"".pdf""1""2026-10-05T13:59:22.113+00:00""4e78b327607542388e45ee86130f33fb""public""0""public""0d1e71b468e246da8cb260146c986c56""0"4"0""Att 04_EGLE Permit_251106.pdf"26705077"file"".pdf""1""2026-10-05T13:59:22.113+00:00""34779b1dfe134ec586cca65f53621c3c""public""0""public""f88dd8caa03444f0ab06906cf3a67361""0"3"0""Att 05_Wage Rates_260625.pdf"316619"file"".pdf""1""2026-10-05T13:59:22.113+00:00""5a3755279d9b4d8eb972894f6ca5220b""public""0""public""75ce316c08a14ebc8502911726427e64""0"2"0""HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf"827734"file"".pdf""1""2026-10-05T13:59:22.113+00:00""6e5adbcba721490b9dff12cfd58262ca""public""0""public""9cd0ac93f008414c89434511015bae75""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0fd9c768b982494cb07fb06e5743eae4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.